首页> 外文会议>International Naval Engineering Conference and Exhibition >Acquisition of ALBION and BULWARK Lessons Learnt
【24h】

Acquisition of ALBION and BULWARK Lessons Learnt

机译:收购Albion和Bulwark经验教训

获取原文

摘要

With HMS ALBION now in service and HMS BULWARK due to enter service in 2005, it is perhaps opportune to look at some of the lessons we can take forward to other platform procurement projects. The two new ships offer significant enhancements to the capabilities offered in HMS FEARLESS and HMS INTREPID and are indeed the first RN manned warship to adopt Integrated Electrical Propulsion (IEP) and widespread use of a Platform Management System (PMS). The paper will assess at a high level a range of related issues, including: Standards, Design, IEP, PMS, Construction, Damage Control and Firefighting, Training and Support.
机译:使用HMS Albion现在在2005年进入服务时,HMS Bulwark由于进入服务,可能需要查看一些我们可以向其他平台采购项目提出的课程。这两艘新船舶对HMS无所畏惧和HMS Intrepid中提供的能力提供了显着的增强,并且确实是第一个采用集成电气推进(IEP)的RN载人战舰,并广泛使用平台管理系统(PMS)。本文将在一系列相关问题的高水平评估,包括:标准,设计,IEP,PM,施工,损坏控制和消防,培训和支持。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号