首页> 外文会议>International congress on environmental geotechnics >Application of a dry cover system to remediate acid rock drainage generation in the uranium mining and milling site of Pocos de Caldas, Brazil
【24h】

Application of a dry cover system to remediate acid rock drainage generation in the uranium mining and milling site of Pocos de Caldas, Brazil

机译:干覆盖系统在巴西Pocos de Caldas铀矿业和铣削现场修复酸岩排水生成

获取原文

摘要

This paper addresses the remediation of acid rock drainage originated in one of the waste rock piles of the mining and milling site of Pocos de Caldas. The dump consists of a total amount of 29.8 x 10~6 tons corresponding to a volume of 12.4 x 10~6 m~3. It was estimated that acid drainage generation will last for 600 years and because of that permanent remedial solutions will have to be considered. In this paper the efficiency and costs of a dry cover system was assessed. It was found that the application of a material with a diffusion coefficient to oxygen of 10~(-9) m~(-2) and with a thickness of 1.0 m would reduce the pollutant loads to acceptable values. The overall costs of this remediation scheme would amount US$ 10 million.
机译:本文涉及酸岩排水的修复,起源于Pocos de Caldas的采矿和研磨部位之一。转储包括总金额为29.8×10〜6吨,对应于12.4×10〜6 m〜3的体积。据估计,酸引流发电将持续600年,并且由于必须考虑永久性补救解决方案。本文评估了干覆盖系统的效率和成本。发现将具有扩散系数的材料与10〜(-9)m〜(-2)的施加施加,厚度为1.0μm将减少污染物载荷对可接受的值。本修复计划的总成本将为1000万美元。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号