首页> 外文会议>International Conference on Soil Mechanics and Geotechnical Engineering >Horizontal soil movements in excavations protected by sheet-pile cut-offs
【24h】

Horizontal soil movements in excavations protected by sheet-pile cut-offs

机译:通过薄板剪切保护的挖掘水平土壤运动

获取原文

摘要

This paper reports on the measurements taken of horizontal movement during the excavation of a 5-m deep and 7-m wide trench created for the installation of 5 X 3 metre concrete caissons to channel water from two streams running in the vicinity. Thealluvial deposit in the stream at the excavation site consists of gravel with a sufficiently thick clayey matrix to enable a sheet-pile cut-off wall to be sunk over three metres down. The construction process used consisted of driving the sheet pile in by vibration to a depth of over 3 m beneath the bottom of the excavation, digging an 0.60-m pit to fix bracing at the head of the cut-off and excavating down to 5 metres. Once the caissons were in place, the trench was refilled and the sheet pile removed.The excavation site was on an urban street, making it necessary to assess the extent and scale of any possible horizontal movement, in order to take the appropriate steps to prevent problems occurring in adjoining buildings. Measurements were taken during the excavation work of the horizontal movement occurring. The paper reports on the results.
机译:本文报告了在挖掘的挖掘过程中采取的测量,为5米的深度和7米宽的沟槽,为安装5 x 3米混凝土沉箱,从附近运行的两条溪流通道水。挖掘部位的溪流中的胫骨沉积物由带有足够厚的粘土矩阵的砾石组成,以使薄片剪切墙为3米以上沉没。使用的施工过程包括在挖掘底部的底部振动驾驶纸张桩,深度超过3米,挖掘0.60米的坑以固定在切断头部并挖掘下来至5米。一旦沉箱到位,沟槽就会重新填充,拆除板材桩。挖掘网站在城市街道上,使得有必要评估任何可能的水平运动的程度和规模,以便采取适当的步骤预防毗邻建筑物发生的问题。在发生水平运动的挖掘工作期间采取了测量。论文报告了结果。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有