首页> 外文会议>Symposium on strait crossings >Implementation of Mobile Scaffolding in the Construction of Suez Canal Bridge
【24h】

Implementation of Mobile Scaffolding in the Construction of Suez Canal Bridge

机译:苏伊士运河桥梁施工中的移动脚手架的实施

获取原文

摘要

Bridges in Egypt under the control of GARBLT (General Authority for Roads and Bridges and Land Transportation) had been subjected to chronological progress in the last decade. This paper aimed at presenting the criteria of using Mobile Scaffolding system (MSS) in the West Portion of Suez Canal Bridge of length 1170 m. The paper reflects a particular emphasis regarding the stability of the Mobile Scaffolding and its fixation to the Pier Columns using shear keys. Finite element modeling had been undertaken, constitutive models for concrete had been utilized providing for cracking and reflecting the effect of lateral confinement " by horizontal prestressing bars" on the total stability. Finally, the adopted construction method using the Mobile Scaffolding (MSS) and related construction aspects had been highlighted.
机译:在Garblt控制下埃及的桥梁(道路和桥梁和土地交通的一般权威)在过去十年中受到了按时间顺序进展。本文旨在提出使用移动脚手架系统(MSS)在苏伊士河管桥的西部长度1170米的标准。本文反映了特别强调使用剪切键对移动脚手架的稳定性及其对墩柱的固定。已经采用有限元建模,利用了混凝土的本构模型,提供了裂缝和反映水平预应力“通过水平预应力棒”的效果对总稳定性的影响。最后,突出了使用移动脚手架(MSS)和相关施工方面的采用的施工方法。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号