首页> 外文会议>Fourth Symposium on Strait Crossings, Sep 2-5, 2001, Bergen/Norway >Implementation of Mobile Scaffolding in the Construction of Suez Canal Bridge
【24h】

Implementation of Mobile Scaffolding in the Construction of Suez Canal Bridge

机译:苏伊士运河大桥施工中移动脚手架的实施

获取原文
获取原文并翻译 | 示例

摘要

Bridges in Egypt under the control of GARBLT (General Authority for Roads and Bridges and Land Transportation) had been subjected to chronological progress in the last decade. This paper aimed at presenting the criteria of using Mobile Scaffolding system (MSS) in the West Portion of Suez Canal Bridge of length 1170 m. The paper reflects a particular emphasis regarding the stability of the Mobile Scaffolding and its fixation to the Pier Columns using shear keys. Finite element modeling had been undertaken, constitutive models for concrete had been utilized providing for cracking and reflecting the effect of lateral confinement " by horizontal prestressing bars" on the total stability. Finally, the adopted construction method using the Mobile Scaffolding (MSS) and related construction aspects had been highlighted.
机译:在过去的十年中,由GARBLT(公路和桥梁及陆地运输总局)控制的埃及桥梁在时间上取得了进步。本文旨在提出在长度1170 m的苏伊士运河大桥西段使用移动脚手架系统(MSS)的标准。本文反映了有关移动脚手架的稳定性以及使用剪切键将其固定在墩柱上的特别重视。进行了有限元建模,利用了混凝土的本构模型进行开裂,并反映了“水平预应力棒”对横向约束对整体稳定性的影响。最后,重点介绍了采用移动脚手架(MSS)的施工方法以及相关的施工方面。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号