首页> 外文会议>International conference on soft soil engineering >Integrate Approach for Deep Excavation along Soft Ground (MTRC) Tunnels
【24h】

Integrate Approach for Deep Excavation along Soft Ground (MTRC) Tunnels

机译:沿着软土地带(MTRC)隧道深度挖掘的方法

获取原文

摘要

A four level basement has been constructed at a distance less than 5m away from the existing MTRC tunnels in soft ground. The principal constraint on the design and construction is the need to avoid the disruption of the existing tunnels operation. A comprehensive monitoring system with real time design review have been carried out in the integrated manner. These were achieved by comparisons of monitoring results with defined acceptable limits, and by planned contingencies in the event that these limits were approached. This paper presents the integrated approach (numerical and observational) developed during design and construction which incorporates finite element modeling and construction monitoring. The overall leads to the success to control the tunnels movements less than 20mm caused by the underground construction work without interruption to the existing tunnels operation.
机译:四级地下室已经在距离软土地带中的现有MTRC隧道距离小于5米的距离。关于设计和构造的主要限制是需要避免现有隧道操作的破坏。具有实时设计审查的全面监测系统以综合方式进行。这些通过对规定可接受限制的监测结果进行了比较,以及计划的违规行为在这种限制接近这些限制的情况下进行了比较。本文介绍了在设计和施工期间开发的综合方法(数值和观察),它包括有限元建模和施工监测。整体导致控制隧道运动小于20毫米的成功,而不会中断现有的隧道操作。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号