Integrate Approach for Deep Excavation along Soft Ground (MTRC) Tunnels

机译:沿软土地基(MTRC)隧道进行深基坑开挖的综合方法

获取原文
获取原文并翻译 | 示例

摘要

A four level basement has been constructed at a distance less than 5m away from the existing MTRC tunnels in soft ground. The principal constraint on the design and construction is the need to avoid the disruption of the existing tunnels operation. A comprehensive monitoring system with real time design review have been carried out in the integrated manner. These were achieved by comparisons of monitoring results with defined acceptable limits, and by planned contingencies in the event that these limits were approached. This paper presents the integrated approach (numerical and observational) developed during design and construction which incorporates finite element modeling and construction monitoring. The overall leads to the success to control the tunnels movements less than 20mm caused by the underground construction work without interruption to the existing tunnels operation.
机译:已在距软土地基上现有的MTRC隧道不到5m的距离建造了四层地下室。设计和施工的主要制约因素是需要避免破坏现有的隧道运营。集成了带有实时设计审查的综合监控系统。通过将监控结果与已定义的可接受限制进行比较,并在达到这些限制时通过计划的突发事件来实现这些目标。本文介绍了在设计和施工过程中开发的集成方法(数值和观察方法),其中包括有限元建模和施工监控。总的来说,在不中断现有隧道运营的情况下,成功地控制了地下施工所引起的小于20mm的隧道运动。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号