首页> 外文会议>ASES Annual Conference >IMPLEMENTATION OF SOLAR PROJECTS BY DONOR GROUPS - THE NIGERIAN EXPERIENCE
【24h】

IMPLEMENTATION OF SOLAR PROJECTS BY DONOR GROUPS - THE NIGERIAN EXPERIENCE

机译:捐助团体的太阳能项目的实施 - 尼日利亚经验

获取原文

摘要

This paper discusses the successes/failures of the implementation of solar projects in Nigeria by various donor groups/organizations in the bid to enhance the living conditions of the populace of the developing countries. The solar power technology initiatives in Nigeria to date through several Non-Governmental Organizations in cooperation with host Government have achieved marginal results. It is therefore pertinent to note that some modifications in the implementation of future and/or ongoing projects will produce much better results in our opinion. We recommend the following: Firstly, the donor groups should liaise with the in-country Solar Energy Commission where available, otherwise the primary step will be to sensitize the recipient country to the need for such a regulatory body without the attendant bureaucratic bottlenecks. Secondly, there must be proper co-ordination of proposed projects by the donor groups. This will require effective communication with the Solar Energy Commission in order to prevent multiple financial provisions for the same project(s).
机译:本文讨论了各种捐助团体/组织在尼日利亚实施的太阳能项目实施的成功/失败,以加强发展中国家民众的生活条件。尼日利亚的太阳能技术举措迄今为止与若干非政府组织与东道国政府合作实现了边际成果。因此,有关的是,请注意,在我们认为未来和/或正在进行的项目实施中的一些修改将产生更好的结果。我们建议如下:首先,捐助团队应与境内太阳能委员会联络,否则主要步骤将使受援国致富受援国,在没有服务员官僚主义瓶颈的情况下需要这种监管机构。其次,捐助团必须有适当的拟议项目协调项目。这需要与太阳能委员会有效沟通,以防止同一项目的多项财务规定。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号