Emergency Deck Replacement for the Brooklyn Bridge by Design-Build

机译:通过设计制造的Brooklyn Bridge的紧急甲板更换

获取原文

摘要

The Design-Build team developed a method of operation that allowed them to complete the deck replacement in 120 nights, earning the entire incentive. Several objectives were achieved with the successful completion of this contract. The accelerated removal of the old deck prevented the deterioration from progressing to the point where the traveling public would have been endangered. The removal of the old deck and installation of the new deck were accomplished quickly, with a minimum of disruption to traffic. The new deck can be expected to last for several decades. This project brought together the talent and experience of all parties involved, who overcame tremendous obstacles in providing necessary service to the traveling public. The contractor, design consultant, grid manufacturer and NYCDOT administrators deserve accolades for the commitment they demonstrated in keeping construction inconvenience to a minimum.
机译:设计制造团队开发了一种操作方法,使其允许他们在120晚上完成甲板更换,赢得整个激励。通过成功完成本合同,实现了一些目标。加速拆除旧甲板防止了进展到旅行公众濒危的程度的恶化。旧甲板和安装新甲板的拆除是快速完成的,对交通中的扰乱最少。新甲板可以预期持续数十年。该项目汇集了所涉及的各方的人才和经验,他克服了向旅游公众提供必要的服务。承包商,设计顾问,电网制造商和NYCDOT管理员应得的赞誉,以便他们证明施工不便最低。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号