首页> 外文会议>Annual international bridge conference and exhibition >Protective coating analysis and bridge maintenance
【24h】

Protective coating analysis and bridge maintenance

机译:保护涂层分析和桥梁维护

获取原文

摘要

Recent cost escalations have made bridge painting a major component of annual bridge budgets.The New York State Thruway Authority (NYSTA) contracted with KTA to develop a bridge maintenance painting planning subroutine that will coordinate with existing in-house BMS software.The NYSTA can now integrate paint condition with wuperstructure life-cycle analyses to assure that the appropriate corrosion protection strategy is selected.This effort is believed to be the first time that such a program has been undertaken on a system-wide basis by a major bridge owner.
机译:最近的成本升级使桥梁绘制了一年一度的桥梁预算的主要成分。纽约国家历史权威(NYSTA)与KTA合同,开发一个桥梁维护绘画规划规划子程序,将与现有的内部BMS软件协调.Nysta现在可以 将油漆状况与Wuperstructule的生命周期分析,以确保选择适当的腐蚀保护策略。这一努力是第一次由主要桥梁所有者在系统范围内进行的第一次进行。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号