首页> 外文会议>International Mining Geology Conference >The discovery of the QTS Central ore system, CSA mine, Cobar, NSW, Australia
【24h】

The discovery of the QTS Central ore system, CSA mine, Cobar, NSW, Australia

机译:发现QTS Central Ore System,CSAINE,Cobar,NSW,澳大利亚

获取原文

摘要

This paper aims to summarise the discovery of the QTS Central resource, a previously unidentified +1 Mt inferred resource that lies between two major CSA resource systems.The 1.7 Mt at 5.76 per cent Cu, QTS Central ore system represents l/6th of the CSA mineral resource and was discovered in 2014 based on the accumulation of historic exploration records dating back to 1989.The CSA deposit consists of five ore systems hosted within turbidite-derived siltstones (CSA Siltstone) and lesser sandstones (five per cent) of the Devonian Amphitheatre Group. The host sediments strike approximately north-south with a steep westerly dip and exhibit a well-developed east dipping cleavage. Most CSA mineralisation is hosted within dilation zones at the intersection of cross-cutting structures and is interpreted as epigenetic in origin.Alteration and weak mineralisation, up plunge to the reported QTS Central mineral resource, was initially detected in 1990 during a downhole electromagnetic conductivity (EM) study, where one hole indicated an off-hole conductor, later tested with four diamond holes. One of these diamond holes intersected 3 m at 7.5 per cent Cu at 200 m. Development of the 9070 Subway drive in 2005/2006, linked the QTS North and QTS South workings and intersected structures interpreted to host QTS Central mineralisation. Subsequent drilling proximal to the 9070 Subway in 2007 identified an up plunge extension to the QTS Central zone (UDD07152:1.8 m at 6.3 per cent Cu from 10.7 m). Work on QTS Central was largely forgotten until 2012 when the mining of a 450 m infrastructure drive provided a platform to test the anomalous grades. In December 2013, drill hole UDD13055A intersected 20.9 m at 7.2 per cent Cu from 378 m. By the end of 2014, the QTS Central inferred resource was 1.0 Mt at 6 per cent Cu and 18 g/t Ag (Hosken and Apaza, 2014). Late in 2016, further infill drilling occurred from two fronts to increase confidence in the QTS Central resource. The results of this drilling are expected late in 2017.The current interpretation indicates the QTS Central system consists of two main lenses hosted within closely bedded sandstones and siltstones. The sandstone in general is not mineralised, being heavily silicified, while the siltstone is mineralised and chloritised. The main mineralised lens is 75-200 m along strike and 450 m high. Massive sulfide feeder structures lie at the core of the two main lenses, although the characteristics of the QTS Central system tend toward the mineralisation being more chlorite-rich than in QTS North and QTS South.
机译:本文旨在总结QTS中央资源的发现,先前未识别的+1 MT推断资源,这些资源在两个主要的CSA资源系统之间。QTS中央矿石系统的1.7公吨,QTS中央矿石系统代表CSA的L / 6th矿产资源并于2014年发现,基于历史探索记录的历史探索记录恢复到1989年。CSA押金包括五个矿石系统,托管在浊度衍生的泥石龙(CSA Siltstone)和较小的砂岩(5%)的德文郡圆形剧场团体。宿主沉积物大约朝南击中南北,陡峭的西风倾斜,展出了一个发达的东部浸渍切割。大多数CSA矿化在横切结构的交叉点的扩张区内托管,并被解释为OINGININGENECICIC。alteration和弱矿化,在井下电磁电导率期间最初在1990年预测到报告的QTS中央矿产资源。 EM)研究,其中一个孔表示偏孔导体,后来用四个金刚石孔测试。这些钻石孔中的一个在200米处以7.5%的铜相交3米。 2005/2006年开发了9070个地铁驱动器,将Qts North和Qts南部运作和相交的结构解释为主持QTS中央矿化。随后钻探2007年的9070地铁的近端探测到QTS中心区的直升机延伸(UDD07152:1.8M,在10.7米的6.3%)。当450米基础设施驱动器的挖掘提供了一个测试异常等级的平台,在2012年之前,QTS Central的工作基本上被遗忘。 2013年12月,钻孔UDD13055A与378米的7.2%的Cu相交20.9米。截至2014年底,QTS中央推断资源为1.0公吨,占6%CU和18克/ T AG(Hosken和Apaza,2014)。 2016年末,进一步筛分钻探发生在两个前面,以增加对QTS中央资源的信心。预计2017年将预计这次钻探的结果。目前的解释表明QTS中央系统由两个主镜头组成,托管在紧密的砂岩和淤泥内。砂岩一般不是矿化,严重硅化,而硅铁晶是矿化和氯化的。主要矿化镜片沿撞击75-200米,450米高。硫化物馈线结构位于两个主要镜片的核心,尽管QTS中央系统的特点倾向于矿化更丰富的矿化,但南部和QTS Qts Qts Qu Qts。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号