首页> 外文会议>International Conference on Remediation of Chlorinated and Recalcitrant Compounds >Installation of Permeable Reactive Barriers in Urban Residential Environments Surrounding Federal Installations
【24h】

Installation of Permeable Reactive Barriers in Urban Residential Environments Surrounding Federal Installations

机译:在联邦安装周围城市住宅环境中安装可渗透的反应障碍

获取原文

摘要

A full scale iron permeable reactive barrier (PRB), of over 2,000 feet in length comprised of three segments, was constructed down to a depth of approximately 40-feet below ground surface (bgs) in an off-Base residential area surrounding the former Kelly Air Force Base (AFB) in San Antonio, Texas. The two main objectives of the remediation strategy included preventing further off-Base migration of groundwater contaminated with volatile organic compounds (VOCs), primarily trichloroethene (JCE) and tetrachloroethene (PCE) and to ensure groundwater concentrations in off-Base areas meet acceptable groundwater standards. The PRB was constructed by azimuth controlled vertical hydraulic fracturing technology in a residential neighborhood with numerous subsurface and overhead utilities. Trenching was considered a less desirable installation option because of the numerous underground and above ground utilities. The site is in a busy urban area with businesses, schools, and residences; and minimal work space (a two-lane road) where one lane had to remain open during the day and both lanes had to be reopened at night. All sections of the PRB were constructed to the design specifications of approximately three (3) inches in thickness from a depth of approximately twenty (20) feet to a total depth of forty (40) feet bgs. Daily requirements during the drilling portion of the project included limited work hours and the requirement that all equipment be removed from the City of San Antonio (COSA) right-of-way (ROW) on a daily basis. The site conditions existing during frac well installation and PRB construction presented unique challenges to the project and involved the coordination and management of numerous activities from utility clearances, traffic control, material and equipment handling, and environmental controls; while at all times minimizing citizen disruptions to their normal daily environment. This paper describes the construction challenges and logistics that had to be managed to satisfy site-specific constraints for installing an in situ PRB within a residential neighborhood as part of the overall site remediation strategy for the former Kelly AFB.
机译:甲满刻度铁可渗透反应屏障(PRB),超过2000英尺长包括三个区段,在围绕前者凯利截止基地住宅区构造下降到大约40英尺的地面以下(BGS)的深度空军基地(AFB)在圣安东尼奥,德克萨斯州。修复策略的两个主要目标包括防止地下水污染的挥发性有机化合物(VOC)的进一步关闭基地迁移,主要是三氯乙烯(JCE)和四氯乙烯(PCE),并确保地下水浓度在离基地领域符合可接受地下水标准。该PRB被方位控制立式水力压裂技术在一个居民区与众多的地下和高架公用事业建设。挖沟被认为是一个不太理想的安装选项,因为在众多的地下和地上实用工具。该网站与企业,学校和住宅繁忙的市区;而其中一个车道有最小的工作空间(两车道)白天保持开放和两个车道不得不在晚上重新开放。的PRB的所有切片构造成的厚度大约三(3)英寸的设计规格从大约二十(20)英尺的深度到四十(40)英尺的BGS的总深度。该项目的钻探部分在日常要求包括有限的工作时间,并要求铁路地役权每天(ROW)所有设备从圣安东尼奥市(COSA)的去除。压裂井的安装和PRB施工期间现有的场地条件提出了独特的挑战,以项目和参与的协调和从公用间隙,交通控制,材料和设备的处理,和环境控制的许多活动的管理;而在任何时候都尽量减少公民中断正常的生活环境。本文描述了不得不进行管理,以满足特定地点约束为前者凯利空军基地的总体场地修复策略的一部分居民区内的原位PRB安装的建设的挑战和物流。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号