SUPPORTING ONE SUBWAY TO MAKE ROOM FOR ANOTHER

机译:支持一个地铁为另一个房间

获取原文
获取原文并翻译 | 示例

摘要

As part of the 7-Line Extension Project in New York City, the 42nd Street Station ofrnthe A, C, E subway needed to be underpinned while the existing rock grade was loweredrnand then new structural steel installed. This work was completed with no impactrnon the operating subway or traveling public. Extensive instrumentation was requiredrnto monitor deflection in structure during the entire excavation and installation process.rnThis underpinning supported 4 subway tracks, a mezzanine level, 10 feet of earthrnand utilities, and 6 lanes of traffic. Rock was excavated using drill and split methodsrnworking alongside existing footings and girders supporting the subway above.rnSpecialized equipment to work in the tight confines were brought in using work trains tornhelp with the excavation. Removal of the existing rivets and installation of new steel andrnbolts had to be done while existing steel was under load. A detailed erection sequencernwas required for the installation. The load transfers sequence was planned in detail andrnrequired chaining a series of hydraulic jacks to reach the high loads that were uniquernto each column.
机译:作为纽约市7线扩建项目的一部分,A,C,E地铁的第42街车站需要加固,同时降低现有的岩石等级,然后安装新的结构钢。这项工作是在没有影响地铁运营或公众旅行的情况下完成的。在整个开挖和安装过程中,需要大量的仪器来监测结构的挠度。这支撑了4条地铁轨道,夹层,10英尺的土方和公用事业以及6条车道。使用钻头和劈开方法开挖岩石–在支撑地铁的现有地基和大梁旁边进行工作。–使用在开挖过程中受到帮助的工作列车引入了在狭窄范围内工作的专用设备。必须在现有钢负载的情况下拆除现有的铆钉并安装新的钢和螺栓。安装需要详细的安装顺序。计划了详细的载荷转移顺序,并要求将一系列液压千斤顶链接起来,以达到每列唯一的高载荷。

著录项

  • 来源
    《》|2011年|p.189-203|共15页
  • 会议地点 San Francisco CA(US);San Francisco CA(US)
  • 作者单位

    Skanska USA Civil Northeast;

    Skanska USA Civil Northeast;

  • 会议组织
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 隧道施工;
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号