首页> 外文会议>International System Safety Conference >Reducing High Impact Events by Implementing a Deep Dive Process Early in the Event Closure Lifecycle
【24h】

Reducing High Impact Events by Implementing a Deep Dive Process Early in the Event Closure Lifecycle

机译:通过在事件关闭生命周期提前实施深度潜水过程来减少高影响事件

获取原文

摘要

The Event Closure Lifecycle did not originally leverage the subject matter expertise of the Error Prevention Point of Contact until later in the process. Assigning a preliminary Impact Index score provides the opportunity to implement a Deep Dive Process. Defining an Impact Index threshold is important when implementing a Deep Dive Process. Events with an Impact Index Score above the threshold trigger the Deep Dive Process. The Impact Index threshold can be reduced periodically to increase Deep Dive Process oversight requirements. The Deep Dive Process augments the Event Closure Lifecycle, leveraging the subject matter expertise of the Error Prevention Point of Contact earlier in the Event Closure Lifecycle. The Deep Dive Process resulted in an increased level of depth and improved results for the causal analysis and corrective action determination / implementation processes. The increased level of depth and improved results ultimately led to a reduction in system risk over time that was obtained by reducing the number of Events with Impact Index over the threshold. The overall level of safety within the enterprise was increased by leveraging the subject matter expertise of the Error Prevention Point of Contact early in the Event Closure Lifecycle.
机译:事件闭合生命周期未原始利用预防误差接触点的主题专业知识,直到在此过程中以后。分配初步影响指数分数提供了实现深度潜水过程的机会。在实现深度潜水过程时,定义影响索引阈值很重要。阈值高于阈值的影响指数得分的事件触发了深度潜水过程。可以定期减少冲击指数阈值以增加深度潜水过程监督要求。深度潜水过程增强了事件关闭生命周期,利用事件闭合生命周期前面的误差接触点的主题专业知识。深度潜水过程导致深度增加,改善了因果分析和纠正措施确定/实施过程的结果。增加的深度水平和改善的结果最终导致通过减少通过阈值的影响指数的事件数量而获得的系统风险的减少。通过利用事件关闭生命周期早期利用预防误差接触点的主题专业知识来增加企业内的总体安全水平。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号