首页> 外文会议>American waterjet conference >DESIGNING AND BUILDING A WATERBLAST TRAINING COMPLEX
【24h】

DESIGNING AND BUILDING A WATERBLAST TRAINING COMPLEX

机译:设计和建立水壶训练复合体

获取原文
获取外文期刊封面目录资料

摘要

This paper will describe a Training Complex designed and built at MPW Industrial Services, Inc.'s Hebron, Ohio, headquarters. The Complex consists of a 40-foot high training tower incorporating several areas for hands-on waterblast training, including a 16-foot vertical condenser with confined space access; a stack-tool tower; an area for overhead waterblasting; and the means to string waterblast hose 40 feet up and back down. A 35-foot tank truck shell incorporates confined space access to a horizontal heat exchanger, while a separate stand-alone horizontal tube bundle is also available for hands-on lancing experience. A 6-inch underground polyethylene pipe with elbows is also available for line moleing experience. The paper will include photos of the Training Complex in use, as well as the philosophy behind the development of the Complex.
机译:本文将描述在MPW Industration Services,Inc。的Hebron,俄亥俄州,总部的设计和建造的培训复杂。该综合体由一个40英尺高训练塔组成,其中包括几个用于动手水壶训练的领域,包括16英尺的垂直冷凝器,具有限制空间进入;堆叠工具塔;架空润滑油的区域;并且串行软管40英寸向上并返回手段。 35英尺的罐式卡车壳内包含受限的空间进入水平热交换器,而单独的独立水平管束也可用于动手灌溉体验。带肘部的6英寸地下聚乙烯管也可用于线路MOREING体验。本文将包括使用中培训复合体的照片,以及复杂的发展背后的哲学。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号