【24h】

DESIGNING AND BUILDING A WATERBLAST TRAINING COMPLEX

机译:设计和建造喷水训练综合体

获取原文

摘要

This paper will describe a Training Complex designed and built at MPW Industrial Services, Inc.'s Hebron, Ohio, headquarters. The Complex consists of a 40-foot high training tower incorporating several areas for hands-on waterblast training, including a 16-foot vertical condenser with confined space access; a stack-tool tower; an area for overhead waterblasting; and the means to string waterblast hose 40 feet up and back down. A 35-foot tank truck shell incorporates confined space access to a horizontal heat exchanger, while a separate stand-alone horizontal tube bundle is also available for hands-on lancing experience. A 6-inch underground polyethylene pipe with elbows is also available for line moleing experience. The paper will include photos of the Training Complex in use, as well as the philosophy behind the development of the Complex.
机译:本文将介绍在MPW工业服务公司位于俄亥俄州希伯伦的总部设计和建造的培训中心。该综合大楼由一个40英尺高的训练塔组成,其中包括几个可以进行动手水刀训练的区域,其中包括一个16英尺的垂直冷凝器,可进入有限的空间;堆栈工具塔;高架喷水区;以及将输水软管向上和向下拉动40英尺的方法。 35英尺的油罐车外壳在狭窄的空间中通向水平热交换器,同时还提供单独的独立水平管束,以提供动手操作的经验。也可提供带弯头的6英寸地下聚乙烯管道,以进行线路消音体验。该文件将包括正在使用的培训中心的照片,以及该中心发展背后的理念。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号