RECONSTRUCTION OF GAS DISTRIBUTION PIPELINES IN MOZG IN POLAND USING PE AND PA PIPES

机译:使用PE和PA管道重建Mozg中Mozg中的气体分配管道

获取原文

摘要

MOZG - Warsaw Regional Gas Distribution Company was established in 1856. Now it is one of six gas distribution companies in Poland and covers about a quarter of the area of our country. We serve 1.8 million customers in total. The total length of our distribution network is approximately 20,000 km and the quality of the greater part of our pipelines is suitable for the current level of demand. However, approximately 150 tan of our network is made of steel or cast iron constructed pre 1955. Additional some 3000 km of piping is between 15 to 40 years old. Due to steadily increasing safety demands, some of the pipelines will need reconstruction. The majority of the substandard piping is located in urban areas; It is common to find gas pipes buried under roads and pavements along with other utilities (water, sewage, power and communications) leaving these underground areas crowded. Also due to the recent increase in "traffic volume" it has become more and more difficult to conduct pipeline reconstruction by conventional "trench excavation" pipe replacement techniques. Therefore, the need exists for using an alternative more advanced method of reconstruction. A variety of advanced methods have been developed and applied in many countries all over the world, including Poland. Having analyzed the methods available, bur company decided to undertake some trial reconstruction projects. We wanted to gain experiences in applying reconstruction technologies using two different plastic materials polyethylene and poliamide. We also wanted to assess the technical and economic practicalities of perforating relining processes. In our opinion the following projects: 1. PE project -large diameter polyethylene relining (Φ 450 mm) conducted in Warsaw in 1994/95 2. PA projects - relining using poliamide pipes, projects conducted in Radom and in Warsaw during 1993 and 1994 are the most interesting and representative for this kind of works. Thanks to the experience obtained whilst carrying out these projects, reconstruction of old gas pipelines has become routine. Now we often use polyethylene relining of smaller diameters (20 ÷ 335 mm) and we continue both construction and reconstruction of gas network using PA pipes. Today we have about 75 km of pipelines reconstructed by PE relining and over 100 km of PA network (20 km of new and 80 km of reconstructed pipelines).
机译:Mozg - 华沙​​地区天然气配送公司成立于1856年。现在它是波兰六家天然气分销公司之一,涵盖了我国地区的四分之一。我们共提供180万客户。我们的分销网络的总长度约为20,000公里,我们的管道大部分的质量适用于目前的需求水平。然而,我们的网络大约150吨网络由钢或铸铁制成1955年。额外的约3000公里的管道介于15至40岁之间。由于稳步提高了安全要求,一些管道将需要重建。大多数不合标准的管道位于城市地区;很常见的是寻找埋在道路和人行道下的气体管道以及其他公用事业(水,污水,电力和通信),使这些地下地区拥挤。同样由于近期“交通量”的增加,通过传统的“沟槽挖掘”替换技术,越来越难以进行管道重建。因此,需要使用替代方案的重建方法。已经开发了各种先进的方法,并在世界各地的许多国家开发和应用,包括波兰。分析了可用的方法,Bur公司决定承接一些试验重建项目。我们希望利用两种不同的塑料聚乙烯和普利亚德应用重建技术的经验。我们还希望评估穿孔的技术和经济实用性。在我们看来,以下项目:1。在1994/95年度,PE Project -large直径聚乙烯在华沙进行的直径聚乙烯在华沙进行2.PA项目 - 使用POLIAMIDE管道,在1993年和1994年,在Radom和Warsaw中进行的项目进行重新开展。这种作品最有趣和最有趣的代表。由于在进行这些项目的同时获得的经验,老燃气管道的重建已成为常规。现在我们经常使用较小的直径(20÷335毫米)的聚乙烯,我们使用PA管继续施工和重建天然气网络。今天,我们有大约75公里的管道,通过PE重新设计,超过100公里的PA网络(距离重建管道的20公里和80公里)。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号