After a successful blowdown of #3 blast furnace, which took 11 1/2 hours, the furnace was quenched to prepare for the top change and stack gunniting. The quench was controlled by the top sprays thru a Bristol Micro Processor and took about 21 hours to complete. We used at that time roughly 250,000 gallons of water. The quench was completed on the 19th of July, and after all stocks were dropped by midday, July 20,1992, removal of the top had begun.
机译:在成功排污#3高炉后,淬火炉子以准备顶部变化和堆垛机枪。淬火由顶部喷雾通过Bristol Micro处理器控制,并花费大约21小时完成。我们在那个时间使用大约250,000加仑的水。 Quench于7月19日完成,毕竟股票在7月20日2992年7月20日股票后,删除了顶部已经开始。