首页> 外文会议>International Conference on Nuclear Engineering >THE EUROPEAN UTILITY REQUIREMENTS FOR ADVANCED LIGHT WATER REACTORS (EUR): RECENT ACHIEVEMENTS AND NEW CHALLENGES
【24h】

THE EUROPEAN UTILITY REQUIREMENTS FOR ADVANCED LIGHT WATER REACTORS (EUR): RECENT ACHIEVEMENTS AND NEW CHALLENGES

机译:高级轻型水反应堆的欧洲公用事业要求(EUR):最近的成就和新挑战

获取原文

摘要

Since 1991, the European Utility Requirements (EUR) organisation has been actively developing and promoting harmonised technical specifications for the new mid- and large-size LWR designs to be proposed by the vendors in Europe. The EUR document consists of a comprehensive set of requirements covering the whole Nuclear Power Plant (NPP). It encompasses all aspects (safety, performance, competitiveness) and all parts of a NPP (nuclear island and conventional island). The document can be used by the utilities (guide for design assessment, technical reference for call for bids) and by the vendors, as a technical guide. The harmonisation which is sought after by the EUR aims at delivering the safest and most competitive designs based on common rules shared all over Europe. Fourteen nuclear operators across Europe are members of the organisation. After the publication of the Revision D of the EUR document (October 2012), the EUR organisation has been extremely active. This presentation describes the main results obtained during the last four years and the new challenges for the coming years (roadmap 2016-2018) in the three following fields. First, the revision of the EUR document, in order to maintain it at a state-of-the-art level, remains the highest priority for the organisation. Regarding the new revision E of the EUR document [1], expected to be issued in the 2nd quarter of 2017, the presentation describes the most significant updates implemented in many fields among which: revised safety requirements taking into account the most recent European and international safety standards issued by WENRA and IAEA, the lessons learnt from the Fukushima accident, including re-evaluated seismic and external natural hazards approach and the most recent international standards, for example for Instrumentation and Control (I&C). The assessment of new designs is the second main technical activity of the EUR organisation. The MHI EU-APWR design has been assessed against the revision D between 2012 and 2014. New design assessments are in progress (namely Korean KHNP's EU-APR and Russian AEP's VVER TOI) and are planned to be ended in 2017-2018. A new applicant is in the file. The presentation briefly recalls the EUR design assessment objectives and process and the progress of the different assessment projects. The third topic to be covered by the presentation is the interaction between the EUR and the other stakeholders, in particular the other international organisations (ENISS, WNA/CORDEL, WENRA, IAEA, EPRI/URD). The presentation describes how the EUR organisation is connected to these stakeholders and the corresponding cooperation results and future projects.
机译:自1991年以来,欧洲公用事业需求(EUR)组织一直在积极开发和推广欧洲供应商提出的新中型和大型LWR设计的协调技术规范。欧元文件包括一套全面的要求,涵盖整个核电站(NPP)。它包括所有方面(安全,性能,竞争力)和NPP(核岛和常规岛屿)的所有部分。该文件可由实用程序使用(设计评估指南,出价呼叫的技术参考)和供应商作为技术指南。欧元追捧的协调旨在根据欧洲各地共享的共同规则提供最安全和最具竞争力的设计。欧洲四四核运营商是本组织的成员。在欧元文件的修订D发布后(2012年10月),EUR组织一直非常活跃。本演示文稿描述了在过去四年中获得的主要结果以及在三年的新领域中的未来几年的新挑战(路线图2016-2018)。首先,欧元文件的修订,以便在最先进的水平维持它,仍然是本组织的最高优先事项。关于EUR文件的新修订版E [1],预计将于2017年第二季度发布,该介绍描述了许多领域实施的最重要的更新:根据最近的欧洲和国际的安全要求进行了修订的安全要求由Wenra和Iaea发布的安全标准,从福岛事故中学到的经验教训,包括重新评估地震和外部自然灾害方法以及最近的国际标准,例如用于仪器和控制(I&C)。对新设计的评估是EUR组织的第二主要技术活动。 2012年至2014年间评估了MHI EU-APWR设计。新的设计评估正在进行中(即韩国KHNP的EU-APR和俄罗斯AEP的VVER TOI),并计划于2017-2018结束。新申请人在文件中。演示文稿简要回顾了EUR设计评估目标和过程以及不同评估项目的进度。演示文稿所涵盖的第三个主题是欧元和其他利益攸关方之间的互动,特别是其他国际组织(ENISS,WNA / CORDEL,WENRA,IAEA,EPRI / URD)。演示文稿描述了欧元组织如何与这些利益攸关方和相应的合作结果和未来项目相关联。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号