...
首页> 外文期刊>Nuclear Engineering and Design >How the European Pressurised Water Reactor fulfils the utility requirements
【24h】

How the European Pressurised Water Reactor fulfils the utility requirements

机译:欧洲压水堆如何满足公用事业要求

获取原文
获取原文并翻译 | 示例
           

摘要

The European Pressurised Water Reactor (EPR.) is a project pursued by Electricite de France and the major German utilities (RWEE, PreussenElektra, BAG et al.) on the utility side and SIEMENS, Framatome and their common subsidiary NPI on the designer side. In this project, the experience gained through the design, the erection, the commissioning and the operation of the existing PWR in France and Germany are combined and the existing technical solutions were carefully compared and checked before integration into the EPR. The deep involvement of the future operators since the beginning of the project has the objective of optimising the operational behaviour and making maintenance as easy as possible.
机译:欧洲压水堆(EPR。)是由Electricite de France和公用事业方面的德国主要公用事业公司(RWEE,PreussenElektra,BAG等)以及设计方由SIEMENS,Framatome及其共同子公司NPI进行的项目。在该项目中,结合了法国和德国现有压水堆的设计,安装,调试和运行所获得的经验,并在集成到EPR中之前对现有技术解决方案进行了仔细比较和检查。自项目开始以来,未来操作员的深入参与旨在优化操作行为并尽可能简化维护。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号