首页> 外文会议>International Conference on Nuclear Engineering >NUCLEAR POWER PROJECT PERFORMANCE MANAGEMENT SYSTEM RESEARCH BASED ON THE KPIS
【24h】

NUCLEAR POWER PROJECT PERFORMANCE MANAGEMENT SYSTEM RESEARCH BASED ON THE KPIS

机译:基于KPI的核电项目绩效管理体系研究

获取原文

摘要

The foothold of this paper is the systematic mechanism of the performance management. Combining with the company's current situation and requirements of the nuclear power project management, we build a scientific and effective performance management system of the nuclear power project which using the KPI method as the core. This system includes KPIs library development, performance management plan preparation, process control and supervision, performance evaluation, outcome feedback and application. We aim to improve the project management efficiency, and promote the standardization and systematization of the nuclear power project performance management. This article has an important reference and guidance for nuclear power project management, and continuous improvement will be made to achieve the best practice in the nuclear industry.
机译:本文的立足点是绩效管理的系统机制。结合公司目前的核电项目管理现状和要求,我们建立了一种使用KPI方法作为核心的核电项目的科学和有效的绩效管理体系。该系统包括KPIS图书馆开发,绩效管理计划准备,过程控制和监督,绩效评估,结果反馈和应用。我们旨在提高项目管理效率,促进核电项目绩效管理的标准化和系统化。本文对核电项目管理有一个重要的参考和指导,并将持续改进,以实现核工业的最佳实践。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号