Performance Index Analysis (PIA) for N-1 Contingency Transmission in 150 kV Electricity System

机译:150 kV电力系统中N-1应急传输的性能指标分析(PIA)

获取原文

摘要

Power system security is an important part of the electricity system. An electrical system should be able to detect or analyze the disturbance that occurs. The interference that occurs in the power system is divided into several faults with the generator, transmission, and load. The N-1 transmission contingency is a disturbance caused by outage of one transmission element in the electrical system. One of the analytical methods used for power system security is the Performance Index method. Performance Index Analysis (PIA) is a method used to rank contingencies when one transmission element is independent of the electrical system. Performance Index Analysis helps the engineer to determine the next step that will taken when an N-1 contingency transmission interference occurs in the system. In this study, Newton Raphson method is used to define a load flow in the electrical system. Based on the results of the Performance Index Analysis, it can be known that the load flow calculations using the Newton Raphson method can be used to determine the value of the Performance Index Power and Performance Index Voltage when there is a contingency disturbance. The N-1 contingency transmission scenario 8 is a contingency which has the highest index value in the 150 kV Malang Raya Electricity System. The highest performance index value in this study is 1.614. This index value indicate danger situation in the 150 V Malang Raya electricity systems. Infinite bus voltage has overvoltage of 317.75 kV. It happens because the L8 line dropped, then the active power that should flow towards the L5 line cannot delivered, so the voltage on the Infinite bus side increases. The G. Wlingi Bus, G. Sutami Bus, Kebon Agung Bus, Lawang Bus, Pakis Bus, Sengkaling Bus, Sutami Bus and Wlingi Bus also experience voltage changes of an average of 57% of the voltage under normal condition.
机译:电力系统安全性是电力系统的重要组成部分。电气系统应该能够检测或分析发生的干扰。电力系统中发生的干扰分为几个故障,发电机,传输和负载。 N-1传输应急是由电气系统中的一个传动元件的中断引起的干扰。用于电力系统安全性的分析方法之一是性能索引方法。性能指数分析(PIA)是一种用于在一个传输元件独立于电气系统时对突发发生的方法。性能索引分析有助于工程师确定在系统中发生N-1应急传输干扰时将采用的下一步。在本研究中,牛顿Raphson方法用于在电气系统中定义负载流。基于性能指数分析的结果,可以知道使用牛顿Raphson方法的负载流量计算可用于确定当存在差不休虑时的性能指标功率和性能指标电压的值。 N-1应急传输方案8是150 kV MALANG RAYA电力系统中具有最高指标值的应急。本研究中最高的性能指标值为1.614。该指标值表明了150 V Malang Raya电力系统中的危险情况。无限的总线电压过电压为317.75 kV。它发生的是因为L8线掉落,那么应该朝向L5线流动的有源电力不能传递,因此无限总线侧的电压增加。 G. Wlingi Bus,G. Sutami公共汽车,Kebon Agung Bus,Lawang巴士,Pakis Bus,Sengkaling Bus,Sutami Bus和Wlingi Bus还经常在正常情况下的平均电压的电压变化为57%。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号