首页> 外文会议>IEEE Power and Energy Society General Meeting >Demand resource modeling in PJM capacity market
【24h】

Demand resource modeling in PJM capacity market

机译:PJM容量市场中的需求资源建模

获取原文

摘要

To ensure sufficient resources that are available to be called upon for the reliability of the electric grid, the Reliability Pricing Model (RPM) has been constructed to clear the PJM capacity market. It provides locational capacity pricing to recognize and quantify the locational value of resource capacity to meet the reliability requirements. Starting year 2011 for the 2014/2015 PJM Base Residual Auction (BRA), in addition to the existing Limited Demand Resource (DR) product which is only required to respond no more than 10 times each summer and no more than 6 hours per interruption, two new DR products with fewer limitations have been introduced: Annual(ANL) DR and Extended Summer (ES) DR. To ensure sufficient commitment of less-limited resources, and make use of limited DR resources, the RPM auction clearing needs to recognize and model the maximum allowed quantities of the more-limited DR products. The maximum allowed quantities of more-limited DR products are implemented in RPM auctions as minimum requirements for the less-limited ANL resources and ES resources, which are newly introduced in addition to the total overall resource requirements of the entire PJM RTO and smaller locational regions within the RTO. The DR integrated RPM engine has been used to clear PJM BRA since year 2011. The DR model for PJM capacity market is presented in this paper. Impacts of the capacity requirement enforcement on the market clearing solution and prices are analyzed in details.
机译:为了确保有足够的资源可用于电网的可靠性,已构建了可靠性定价模型(RPM)来清除PJM容量市场。它提供位置容量定价,以识别和量化资源容量的位置值,以满足可靠性要求。从2011年开始的2014/2015年PJM基本剩余竞标(BRA),除了现有的“有限需求资源”(DR)产品之外,该产品仅要求每年夏天响应不超过10次,每次中断响应不超过6小时,推出了两种具有较少限制的新DR产品:Annual(ANL)DR和Extended Summer(ES)DR。为了确保有限资源的充分承诺并利用有限的DR资源,RPM拍卖清算需要识别并建模受限制的DR产品的最大允许数量。 RPM拍卖中实施了限制最大的DR产品的最大允许数量,作为限制较少的ANL资源和ES资源的最低要求,除了整个PJM RTO和较小位置区域的总资源要求之外,新引入了这些限制在RTO中。自2011年以来,DR集成RPM引擎已用于清除PJM BRA。本文介绍了PJM容量市场的DR模型。详细分析了容量需求强制执行对市场清算解决方案和价格的影响。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号