D.C. Circuit to address PJM capacity market rules affecting renewables and demand resources

机译:直流电解决PJM容量市场规则影响可再生能源和需求资源

获取原文
获取原文并翻译 | 示例
       

摘要

Parties to a recent Federal Energy Regulatory Commission proceeding are challenging rules governing the PJM Interconnection's forward capacity market in the U.S. Court of Appeals for the District of Columbia Circuit. PJM-the regional transmission organization that coordinates the movement of wholesale electricity in all or parts of 13 states and the District of Columbia - procures commitments from electric generators and demand resources by conducting auctions, beginning three years in advance of the delivery year, to ensure that the grid has adequate resources. PJM filed its "capacity performance" rules with FERC in December 2014. These rules restructure substantial features of PJM's capacity market. PJM has indicated that these rule changes are necessary in order to meet regional electric reliability needs.
机译:近期联邦能源管理委员会程序的当事方正在挑战美国哥伦比亚特区巡回上诉法院的PJM互连的前向容量市场规则。 PJM-协调13个州全部或部分地区以及哥伦比亚特区的批发电力流动的区域输电组织-通过在交付年份之前三年开始的拍卖活动来获取发电机的承诺和需求资源,以确保网格具有足够的资源。 PJM于2014年12月向FERC提交了其“容量性能”规则。这些规则重组了PJM容量市场的实质特征。 PJM表示,为了满足区域电气可靠性需求,必须更改这些规则。

著录项

  • 来源
    《District energy》 |2016年第4期|57-58|共2页
  • 作者

    Gerit F. Hull;

  • 作者单位

    Jennings, Strouss & Salmon PLC;

  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-18 00:23:28

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号