The paper describes the events that led, in November 2019, to a local blackout in Trentino-Alto Adige (Northern Italy). The events were caused by a heavy snowstorm that resulted in about 7000 faults on the electric system for short-circuits, trees falling on electrical lines etc. In consequence, a 132 kV portion of the grid, and the underlying MV/LV distribution grid, remained isolated from the national transmission grid a part of the 132 kV power system. Overall, approximately 25 thousand customers were involved in a local blackout for more than 24 hours. However, the blackout has been mitigated by the attempts of operating the local system as an electric island, exploiting the black start capability of hydro power plants with enough power capacity to supply the island resulting from the disconnection. The paper describes the main features of the island operation, the main problems encountered until the final restoration, the lessons learned and provides a set of suggestions in order to mitigate the effects of such heavy weather phenomena in the future.
机译:该论文描述了导致2019年11月特伦蒂诺-上阿迪杰(意大利北部)局部停电的事件。这些事件是由一场大雪暴引起的,该雪灾导致电力系统发生约7000个故障,包括短路,树木掉落在电线上等。因此,电网的132 kV部分以及下方的MV / LV配电网,仍与132 kV电力系统的一部分与国家输电网隔离。总体而言,大约有2.5万名客户参与了本地停电超过24小时。但是,通过将本地系统作为电孤岛进行操作的尝试已缓解了停电,该尝试利用了水力发电厂的黑启动能力,该电厂具有足够的电力容量,可以为断开连接后的孤岛供电。本文介绍了岛上作业的主要特征,直到最终修复之前遇到的主要问题,汲取的经验教训,并提供了一些建议,以减轻将来这种恶劣天气现象的影响。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号