首页> 外文会议>North American tunneling conference >An Innovative Approach with Granite Block-Mud Mountain Dam 9-Foot Tunnel Rearmoring Project
【24h】

An Innovative Approach with Granite Block-Mud Mountain Dam 9-Foot Tunnel Rearmoring Project

机译:一种创新方法,具有花岗岩块泥山坝9英尺隧道重新设计项目

获取原文

摘要

Mud Mountain Dam near the base of Mount Rainier includes two tunnels. One of the tunnels has required ongoing invert maintenance due to the passing of high sediment loads. The United States Army Corps of Engineers (USACE) awarded the design-build contract to rehabilitate the tunnel to Garney Construction teamed with ILF Consultants and Golder Associates. Though originally awarded the project for their mechanically anchored steel armor plating design, the team provided the USACE with a value engineering change proposal (VECP) of natural granite blocks. The granite block design provides an increased design life, lower cost, and shorter construction schedule, with construction beginning in July 2017. This paper discusses details and challenges of the VECP from design through initial construction.
机译:雷尼尔山底部附近的泥山大坝包括两个隧道。由于高沉积物负荷的传递,其中一个隧道需要持续的反转维护。美国陆军工程兵团(USACE)授予设计 - 建造合同,以恢复隧道与ILF顾问和Golder Associates合作的Garney Construction。虽然最初授予其机械固定钢制盔甲电镀设计项目,但该团队为自然花岗岩块的价值工程变更提案(VECP)提供了USACE。花岗岩块设计提供了更高的设计寿命,较低的成本和施工时间表,施工时间表于2017年7月开始。本文通过初始建设讨论了VECP的细节和挑战。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号