首页> 外文期刊>Quality World >Tunnel vision-The scale and complexity of the Crossrail project requires some innovative solutions to meet the demands of the contractor self-certification process.Crossrail's Michael Kemp outlines the new approach
【24h】

Tunnel vision-The scale and complexity of the Crossrail project requires some innovative solutions to meet the demands of the contractor self-certification process.Crossrail's Michael Kemp outlines the new approach

机译:隧道愿景-Crossrail项目的规模和复杂性需要一些创新的解决方案来满足承包商自我认证过程的要求。Crossrail的Michael Kemp概述了新方法

获取原文
获取原文并翻译 | 示例
       

摘要

At 14.4bn pounds, Crossrail is Europe's biggest infrastructure project. Stretching from Maidenhead and Heathrow in the west, through central London and across to Shenfield and Abbey Wood in the east, the new railway will cover 118km of track, including 21 km of new tunnels. But how many times have we heard of major infrastructure projects overrunning on time and cost? Classic examples of these are the Channel Tunnel, the Millennium Dome and the new Wembley Stadium. With billions of pounds at stake, cost control is an ever present issue on a project like Crossrail.
机译:Crossrail耗资144亿英镑,是欧洲最大的基础设施项目。新铁路从西部的梅登黑德(Heiderow)和希思罗(Heathrow)延伸,穿过伦敦市中心,再延伸至东部的申菲尔德(Shenfield)和艾比伍德(Abbey Wood),全长118公里,包括21公里的新隧道。但是,我们有多少次听说大型基础设施项目在时间和成本上超支?其中的经典例子是海峡隧道,千年穹顶和新的温布利球场。由于成本高达数十亿英镑,因此在诸如Crossrail之类的项目中,成本控制一直是一个问题。

著录项

相似文献

  • 外文文献
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号