Study on Multi-Objective Project Planning and Scheduling Model with Competitive Collaboration under Resource Constraints

机译:资源约束下具有竞争协作的多目标项目计划与调度模型研究

获取原文

摘要

Since that the collaborative management, planning, and resource scheduling schemes cannot be formulated synchronizly in the present project planning management system, a multi-objective project planning and scheduling integrate models constructed, which is targeted at optimizing project cost and completion time under the resource constrains. Moreover, competitive cooperation plan is introduced in the model and the task can be spitted conditionally with the key resources constrained. At the same time, a NSGA-Ⅱ algorithm is designed, in which a three-dimensional chromosome containing chromosomes of task priority, cooperating task, and cooperating partner is constructed which meets the requirements of multi-objective collaborative decision-making coding scheme. And in this algorithm, the selection, crossover, mutation, and other evolutionary operations are also designed. Finally, a project example is used to verify the correctness of model and the validity of algorithm.
机译:由于在当前的项目计划管理系统中无法同步制定协同管理,计划和资源调度方案,因此构建了一个多目标的项目计划和调度集成模型,旨在在资源约束下优化项目成本和完成时间。 。此外,在模型中引入了竞争合作计划,可以在关键资源受限的情况下有条件地分散任务。同时设计了一种NSGA-Ⅱ算法,构造了一个包含任务优先级,合作任务和合作伙伴的染色体的三维染色体,满足多目标协同决策编码方案的要求。并且在该算法中,还设计了选择,交叉,变异和其他进化操作。最后,通过一个工程实例验证了模型的正确性和算法的有效性。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号