首页> 外文会议>Association of State Dam Safety Officials annual conference >History Being Re-Made: Stabilization of a 146-Year-Old Gatehouse in a High Hazard Class Dam
【24h】

History Being Re-Made: Stabilization of a 146-Year-Old Gatehouse in a High Hazard Class Dam

机译:重现历史:稳定高危害等级大坝中具有146年历史的门楼

获取原文

摘要

This historic gatehouse is a structural component of the High-Hazard Class Chestnut Hill Reservoir Dam in Boston, Massachusetts. The interior of this facility has experienced substantial deterioration due to seepage and age since it was decommissioned many decades ago. Preliminary designs were developed to mitigate the deterioration and stabilize the gatehouse structure. During final stabilization design, record drawings from 1870 were discovered that indicated subterranean arched chambers may have been constructed below the lowest gatehouse level. The presence of the sub-floor chambers needed to be confirmed and the design changed to address the chambers. This paper describes the facility history within Boston's water system for context, the explorations to confirm and better understand these subterranean chambers, the corresponding design changes, and the resulting comprehensive design for stabilizing the structure with concrete fill to meet current dam safety standards.
机译:这座历史悠久的门楼是马萨诸塞州波士顿高危级栗山水库大坝的结构组成部分。自数十年前退役以来,该设施的内部由于渗水和老化而经历了严重的恶化。进行了初步设计以减轻劣化并稳定门房结构。在最终的稳定设计期间,发现了1870年的记录图,这些图表明地下拱形室可能已建在最低门楼以下。需要确认地板下腔室的存在,并更改设计以解决这些腔室。本文介绍了波士顿供水系统中的设施历史,背景,确认和更好地理解这些地下室的探索,相应的设计变更以及由此产生的用于用混凝土填充物稳定结构以满足当前大坝安全标准的综合设计。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号