首页> 外文会议>Smart Grid Conference >Intelligent management of immediate operation of micro grid in fault and load change based on adaptive fuzzy PI controller
【24h】

Intelligent management of immediate operation of micro grid in fault and load change based on adaptive fuzzy PI controller

机译:基于自适应模糊PI控制器的微电网故障和负荷变化立即运行智能管理

获取原文

摘要

The use of power electronic converters for connection to the grids is causing harmonics. In this paper, for elimination of harmonics and increasing the quality of the voltage and output current of inverter, a three-level inverter is used, which connects micro-grid to a commercial electric power distribution system (utility one). An adaptive fuzzy PI controller was also used to control it, which then has a high pace of reply with a good performance in sudden changes of loads. The performance of micro grid in case of faults from utility grid was also analyzed. In this condition, the micro grid is disconnected from utility grid and act islanded. The connection and disconnection act of micro grid from the utility grid should happen rapidly. A simple method with a high speed is presented for this purpose. In the presented method, voltage domain and phase angel of both grids are compared. In case of outgoing of synchronism mode, micro grid is disconnected from the grid. The reconnection of micro grid happens when it is synchronized with the utility grid. Simulation results declare the accuracy of the proposal method.
机译:使用电力电子转换器连接到电网会引起谐波。在本文中,为了消除谐波并提高逆变器的电压和输出电流的质量,使用了三级逆变器,该逆变器将微电网连接到商用配电系统(实用程序)。还使用自适应模糊PI控制器对其进行控制,该控制器具有较高的响应速度,并在负载突然变化时具有良好的性能。还分析了公用电网发生故障时微电网的性能。在这种情况下,微电网会与公用电网断开连接,并处于孤岛状态。微电网与公用电网的连接和断开动作应迅速发生。为此,提出了一种高速的简单方法。在提出的方法中,比较了两个电网的电压域和相位角。在退出同步模式的情况下,微电网与电网断开连接。当微电网与公用电网同步时,将重新连接微电网。仿真结果表明了该建议方法的准确性。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号