首页> 外文会议>Smart Grid Conference >Intelligent management of immediate operation of micro grid in fault and load change based on adaptive fuzzy PI controller
【24h】

Intelligent management of immediate operation of micro grid in fault and load change based on adaptive fuzzy PI controller

机译:基于自适应模糊PI控制器的故障和负荷变化立即运行智能管理

获取原文

摘要

The use of power electronic converters for connection to the grids is causing harmonics. In this paper, for elimination of harmonics and increasing the quality of the voltage and output current of inverter, a three-level inverter is used, which connects micro-grid to a commercial electric power distribution system (utility one). An adaptive fuzzy PI controller was also used to control it, which then has a high pace of reply with a good performance in sudden changes of loads. The performance of micro grid in case of faults from utility grid was also analyzed. In this condition, the micro grid is disconnected from utility grid and act islanded. The connection and disconnection act of micro grid from the utility grid should happen rapidly. A simple method with a high speed is presented for this purpose. In the presented method, voltage domain and phase angel of both grids are compared. In case of outgoing of synchronism mode, micro grid is disconnected from the grid. The reconnection of micro grid happens when it is synchronized with the utility grid. Simulation results declare the accuracy of the proposal method.
机译:使用电力电子转换器以连接到网格正在造成谐波。在本文中,为了消除谐波并增加逆变器的电压和输出电流的质量,使用三级逆变器,将微电网连接到商业电力分配系统(效用)。自适应模糊PI控制器还用于控制它,然后在突然变化的载荷变化下具有良好的性能,在那时具有高的答复速度。还分析了在实用电网故障的情况下微电网的性能。在这种情况下,微网格与公用电网和Act is岛断开连接。从公用电网的连接和断开动作应该迅速发生。为此目的提出了一种具有高速的简单方法。在呈现的方法中,比较两个网格的电压域和相位天使。在出现同步模式的情况下,微网格与网格断开。当它与实用电网同步时,会发生微网格的重新连接。仿真结果宣布提案方法的准确性。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号