首页> 外文会议>ITA-AITES world tunnel congress >Tunneling With Full Face Shielded Machines: A Study on the Backfilling of the Tail Void
【24h】

Tunneling With Full Face Shielded Machines: A Study on the Backfilling of the Tail Void

机译:全罩式盾构机进行隧道掘进:尾部空隙的回填研究

获取原文

摘要

In mechanized tunneling the annular gap between the segmental lining and the surrounding soil caused by tunnel driving, must be backfilled almost instantaneously with an adequate grouting mortar. The objective of this research is to perform a fully three dimensional modeled parametric study using FLAC 3D and evaluate the effects of backfill grouting on the tunneling performance. The research focuses on comparisons between different injection materials and state-of-the-art Bi-Component grout and their effects on the settlements on the surface. The research consists of testing a regular situation of tunnel excavation using a shielded machine with face under pressure. The tunnel dimensions and the soil properties are selected as close as possible to the reality and based on Turin Metro case.
机译:在机械化隧道中,由于隧道掘进造成的分段衬砌和周围土壤之间的环形间隙必须几乎立即用足够的灌浆进行回填。这项研究的目的是使用FLAC 3D进行完整的三维建模参数研究,并评估回填注浆对隧洞性能的影响。该研究的重点是比较不同的注射材料和最新的双组份灌浆及其对表面沉降的影响。该研究包括使用带压力的工作面的屏蔽机测试隧道开挖的常规情况。隧道尺寸和土壤特性应根据都灵地铁案例尽可能接近实际情况进行选择。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号