Research on Cost Control Method based on EVM for Aerospace Advanced Development Projects in China

机译:基于中国航空航天高级开发项目EVM的成本控制方法研究

获取原文

摘要

Aerospace advanced development projects (ADPs) are typical R&D projects, which are of great importance to national defense and national security. With the rapid development of high-tech and advanced management approaches in the world, the extant management methods of advanced development projects, especially control of cost, are not suitable to the development of aerospace industry in China. Effective cost management mechanisms for aerospace ADPs are urgently needed. This paper analyzes the problems in aerospace APDs in China, and puts forward the cost control method based on Earned Value Management (EVM). After making a brief introduction to EVM, this paper illuminates the application of EVM in cost control for aerospace APDs in China, and explicates the processes of this method. The result shows that the method based on EVM is effective in making combined control of cost and schedule.
机译:航空航天高级开发项目(ADP)是典型的研发项目,对国防和国家安全性很重要。随着世界上高科技和先进管理方法的快速发展,高级发展项目的现存管理方法,尤其是对成本的控制,不适合中国航空航天工业的发展。迫切需要用于航空航天ADP的有效成本管理机制。本文分析了中国航空航天APDS中的问题,提出了基于赚取的价值管理(EVM)的成本控制方法。在简要介绍EVM后,本文阐明了EVM在中国航空航天APDS成本控制的应用,并阐述了这种方法的过程。结果表明,基于EVM的方法是有效地制定对成本和时间表的控制。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号