In a recent construction, a new four story building was constructed over a 110 year old brick arch sewer (22' wide and 23'6" high). DC Water learned of the construction after it was completed when the developer applied for water and sewage connection. The developer submitted a structural engineering assessment in an effort to prove that the building does not compromise the brick arch sewer tunnel. Developer's engineer used a simple load-for-load comparison that computes vertical loads only to substantiate that the load of the wood framed building including excavation for basement did not exceed the previous earth load on the sewer. DC Water engineer rejected this simple arithmetic computation as the calculation failed to analyze the impact of the unbalanced load on the masonry arch sewer. Fully aware of the potential of its impact, DC Water's engineers responded by immediately organizing a series of engineering evaluations that consist of in-house FEM (finite element model) structural analysis as well as a geo-structural FEM by a consulting engineer. In this paper, we discuss the results from the two independent FEM analyses. Both these analyses confirm a similar stress/strain mode (tension) on the brick arch sewer. Armed with the results of the analysis, DC Water engineers focused on the tension zones during the inspection and identified a crown fracture under the new building. This paper will provide details and owner's lesson learned regarding the impact of the new construction on a conventional masonry tunnel with modern day engineering tools.
机译:在最近的建筑中,新的四层建筑是在110年历史的砖拱下水道(宽22',高23'6“)上建造的。DCWater在开发商申请水和污水处理后得知了该建筑。开发人员提交了一项结构工程评估,以证明该建筑物不会损害拱形下水道隧道。开发人员的工程师使用了一个简单的“荷载-荷载”比较方法,该计算方法仅计算垂直荷载以证实木材的荷载包括地下室开挖在内的框架建筑物没有超过下水道以前的土方负荷,DC水务工程师拒绝了这种简单的算术计算,因为该计算未能分析不平衡负荷对砌体拱形下水道的影响。受到影响,DC Water的工程师立即组织了一系列工程评估,包括内部FEM(有限元模型)结构咨询工程师进行分析和地理结构有限元分析。在本文中,我们讨论了两个独立的FEM分析的结果。这两个分析都证实了砖拱下水道的应力/应变模式(张力)相似。有了分析结果,DC Water工程师在检查过程中将重点放在了拉伸区域上,并确定了新建筑物下的树冠断裂。本文将提供详细信息和业主的经验教训,以了解新建筑对具有现代工程工具的传统砌体隧道的影响。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号