Rehabilitation of a Critical High-Pressure Transmission Main underneath and in the Vicinity of a Major Highway

机译:恢复临界高压传输主要和在大型公路附近的康复

获取原文

摘要

The joint transmission main (JTM) is part of the 38 mile long Joint Regional Water Supply System, operated and maintained by the South Coast Water District in California. The pipeline, made of 60 in. diameter PCCP manufactured in early 1960s, transports potable water to several service areas with limited redundancy. In 2010, the District started a condition assessment and repair program by performing an electromagnetic (EM) inspection of a 3 mile long section, of which a 1.5 mile long section was re-inspected in 2016. The EM inspections identified seven distressed pipes, one underneath a major highway (SR 133) with 19 ft of soil cover, one underneath the shoulder of the highway, two in the vicinity of the highway adjacent to a major new development, and three others in difficult to access wooded areas. The distressed pipes have a design working pressure of 150 psi to 200 psi and operate at pressures close to design. Considering high consequence of failure, the distressed pipe under the highway was repaired proactively using carbon fiber reinforced polymer (CFRP) liner in Phase 1 of the project. Phase 2 was performed on two pipes to verify the EM results by external inspection, reevaluate failure risk, and perform external post-tensioning repairs if necessary in the same shutdown. External inspections indicated that the EM inspection had significantly overestimated the number of wire breaks, and repair of the two investigated pipes was not necessary at this time. While the district and its consultants spent significant effort in planning and execution of Phase 2, the results proved such efforts worthwhile by avoiding unnecessary repairs and providing valuable information for planning of future inspections and repairs of the JTM. This paper presents planning and execution of both phases of the project from both the district's and the consultant's perspectives.
机译:联合传输主要(JTM)是38英里长期联合区域供水系统的一部分,由加利福尼亚州的南海岸水区运营和维护。由60英寸制成的管道。20世纪60年代初制造的直径PCCP,将饮用水运送到几个服务区域,冗余有限。 2010年,该区通过执行一个3英里长的部分的电磁(EM)检查,其中2016年重新检查了1.5英里长的部分的电磁(EM)检查。EM检查确定了七个陷入困境的管道在一个主要的高速公路(SR 133)下面有19英尺的土壤覆盖,一个在高速公路的肩膀下面,两个在高速公路附近,靠近一个主要的新发展,以及其他三个难以进入树木繁茂的地区。苦恼管道的设计工作压力为150psi至200 psi,并在靠近设计的压力下运行。考虑到失败的高后果,高速公路下的苦恼管道在项目的1阶段使用碳纤维增强聚合物(CFRP)衬里进行了积极修复。在两个管道上进行阶段2,以通过外部检查,重新评估失败风险,并在相同的关机中进行外部张紧维修来验证EM。外部检查表明,EM检查显着高估了线缺失的数量,并且此时不需要修复两种调查管道。虽然该地区及其顾问在规划和执行第2阶段,但结果通过避免不必要的维修并提供有价值的信息,以便为JTM的未来检验和维修提供有价值的信息,证明了这些努力。本文介绍了该地区和顾问的观点的项目的规划和执行。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号