Rehabilitation of a Critical High-Pressure Transmission Main underneath and in the Vicinity of a Major Highway

机译:修复主要公路下方和附近的重要高压输油管道

获取原文

摘要

The joint transmission main (JTM) is part of the 38 mile long Joint Regional Water Supply System, operated and maintained by the South Coast Water District in California. The pipeline, made of 60 in. diameter PCCP manufactured in early 1960s, transports potable water to several service areas with limited redundancy. In 2010, the District started a condition assessment and repair program by performing an electromagnetic (EM) inspection of a 3 mile long section, of which a 1.5 mile long section was re-inspected in 2016. The EM inspections identified seven distressed pipes, one underneath a major highway (SR 133) with 19 ft of soil cover, one underneath the shoulder of the highway, two in the vicinity of the highway adjacent to a major new development, and three others in difficult to access wooded areas. The distressed pipes have a design working pressure of 150 psi to 200 psi and operate at pressures close to design. Considering high consequence of failure, the distressed pipe under the highway was repaired proactively using carbon fiber reinforced polymer (CFRP) liner in Phase 1 of the project. Phase 2 was performed on two pipes to verify the EM results by external inspection, reevaluate failure risk, and perform external post-tensioning repairs if necessary in the same shutdown. External inspections indicated that the EM inspection had significantly overestimated the number of wire breaks, and repair of the two investigated pipes was not necessary at this time. While the district and its consultants spent significant effort in planning and execution of Phase 2, the results proved such efforts worthwhile by avoiding unnecessary repairs and providing valuable information for planning of future inspections and repairs of the JTM. This paper presents planning and execution of both phases of the project from both the district's and the consultant's perspectives.
机译:联合输电总管(JTM)是38英里长的联合区域供水系统的一部分,该系统由加利福尼亚州的南海岸水域运营和维护。该管道由1960年代初制造的直径为60英寸的PCCP制成,将饮用水输送到多个服务区域,而冗余度有限。 2010年,学区通过对3英里长的部分进行电磁(EM)检查来启动状态评估和维修计划,其中2016年对1.5英里长的部分进行了重新检查。EM检查中发现了7条不良管道,其中一条在一条主要高速公路(SR 133)下,土壤覆盖层为19英尺,一个在高速公路的路肩下,两个在高速公路附近,与一个主要的新开发项目相邻,另外三个在难以进入的林区。不良管道的设计工作压力为150 psi至200 psi,并在接近设计的压力下运行。考虑到故障的严重后果,在项目一期中,使用碳纤维增强聚合物(CFRP)衬里积极修复了高速公路下的不良管道。在两个管道上执行阶段2,以通过外部检查来验证EM结果,重新评估故障风险,并在必要时在相同的停机步骤中进行外部后张式维修。外部检查表明,EM检查大大高估了断线的次数,此时无需维修两个被调查的管道。尽管该地区及其顾问在第二阶段的计划和执行上花费了大量精力,但通过避免不必要的维修并为计划JTM的未来检查和维修提供有价值的信息,结果证明了这种努力是值得的。本文从地区和顾问的角度介绍了项目的两个阶段的规划和执行。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号