1. SGB Proof of Concept (POC) Test Plan 1.1 test compliance of MEOSAR system performance using SGB signals compliant with the SGB specification, C/S T.018, with the operational requirements contained in the Operational Requirements for Cospas-Sarsat Second Generation 406 MHz Beacons, C/S G.008. 1.2 Under development at NASA 1.3 Preliminary draft presented during C/S meeting on SGB Development (TG-1/2015).
展开▼
机译:1. SGB概念验证(POC)测试计划1.1使用符合SGB规范C / S T.018的SGB信号以及Cospas-Sarsat第二代406操作要求中包含的操作要求,测试MEOSAR系统性能的符合性MHz信标,C / S G.008。 1.2正在NASA进行开发1.3在C / S关于SGB开发的会议(TG-1 / 2015)上提交的初稿。
展开▼