首页> 外文会议>International foundations congress and equipment expo >A Multistage Signal Matching Approach for Pile Capacity Estimation Using the Instrumented Becker Penetration Test
【24h】

A Multistage Signal Matching Approach for Pile Capacity Estimation Using the Instrumented Becker Penetration Test

机译:使用仪表Becker渗透测试的桩容量估计的多级信号匹配方法

获取原文

摘要

The recently developed instrumented Becker penetration test (iBPT) when configured as a reusable test pile provides direct measurements of strain and acceleration at up to five locations along the drill string. This paper describes details of the test system, measurements, and presents representative results from an iBPT sounding performed at a predominantly fine sand site where indicator test piles were previously installed. The ability of the iBPT system to estimate equivalent SPT N_(60) values at the site is first demonstrated. Representative iBPT pile driving analysis (PDA) measurements obtained from the multiple modules at the base and along the shaft during field driving is then presented. Finally, a new multistage signal matching approach for estimating the distribution of resistance along the pile, and pile ultimate capacity is demonstrated using individual iBPT module dynamic measurements.
机译:当配置为可重复使用的测试桩时,最近开发的仪器佩佩尔渗透试验(IBPT)提供了沿钻柱的最多五个位置的应变和加速度的直接测量。本文介绍了测试系统,测量的细节,并提出了在主要安装指示器测试桩的主要细砂站点的Ibpt探测的代表性结果。首先说明IBPT系统估计站点上的等效SPT N_(60)值的能力。然后呈现从底座上的多个模块和沿轴期间沿着磁场驱动期间获得的代表性的Ibpt倾斜驾驶分析(PDA)测量。最后,使用单独的IBPT模块动态测量来证明,沿着桩的电阻分布和桩极限容量进行了一种新的多级信号匹配方法。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号