首页> 外文会议>International foundations congress and equipment expo >A Multistage Signal Matching Approach for Pile Capacity Estimation Using the Instrumented Becker Penetration Test
【24h】

A Multistage Signal Matching Approach for Pile Capacity Estimation Using the Instrumented Becker Penetration Test

机译:仪表式贝克尔渗透试验的桩容量估计的多阶段信号匹配方法

获取原文

摘要

The recently developed instrumented Becker penetration test (iBPT) when configured as a reusable test pile provides direct measurements of strain and acceleration at up to five locations along the drill string. This paper describes details of the test system, measurements, and presents representative results from an iBPT sounding performed at a predominantly fine sand site where indicator test piles were previously installed. The ability of the iBPT system to estimate equivalent SPT N_(60) values at the site is first demonstrated. Representative iBPT pile driving analysis (PDA) measurements obtained from the multiple modules at the base and along the shaft during field driving is then presented. Finally, a new multistage signal matching approach for estimating the distribution of resistance along the pile, and pile ultimate capacity is demonstrated using individual iBPT module dynamic measurements.
机译:当配置为可重复使用的测试桩时,最新开发的仪器化贝克尔渗透测试(iBPT)可直接测量沿钻柱多达五个位置的应变和加速度。本文介绍了测试系统的详细信息,测量结果,并给出了iBPT测深仪的代表性结果,该测深仪主要是在先前安装有指示器测试桩的主要细砂现场进行的。首先展示了iBPT系统在现场估算等效SPT N_(60)值的能力。然后介绍了在野外作业期间从基座的多个模块以及沿井道的多个模块获得的代表性iBPT桩驱动分析(PDA)测量结果。最后,使用单独的iBPT模块动态测量结果演示了一种新的多级信号匹配方法,用于估计桩沿阻力的分布以及桩的极限承载力。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号