RECONSTRUCTION OF WYNDHAM STREET - CITY OF GUELPH

机译:温德姆街-格尔夫市的重建。

获取原文

摘要

With the construction of a New City Hall, the core area of Guelph has undergone a significant transformation. An integral component of this was the reconstruction of Wyndham Street, from Wellington Street to Carden Avenue, which is the primary gateway to the City's core area of institutional and commercial uses. The reconstruction included new underground services as well as streetscaping, widened sidewalks and bicycle lanes. In order to make this new connection functional, the CN Subway required replacement. The existing CN Subway on Wyndham Street dates back to the early 1900's, and had reached the end of its service life. The bridge abutments were solid concrete, more than 1.0 m thick, with minimal reinforcing and the beam was steel, single span. It was deficient in terms of vertical clearance, had ongoing maintenance issues, and did not provide the horizontal clearance required for the proposed road cross-section. During the preliminary design phase of the project, several issues arose which needed to be addressed as part of the work; these included: 1. The corridor is operated by Rail America, under lease from CN Rail, and had to be maintained for freight and passenger service. 2. The City proposed to construct a bus transit hub at the VIA station area to create a multimodal station. 3. GO Transit was in the process of implementing daily train service to Guelph, which required new platforms and tunnel access from proposed parking areas. 4. The City wished to implement a pedestrian friendly Wyndham Street corridor including bike lanes, wide sidewalk and street scaping. In addition, given narrow right-of-way and the historic structures in the core area, i.e. an Armoury, VIA Station, Cenotaph and designated heritage buildings, setbacks were minimal and the work area was tightly controlled. The AMEC design team, in close consultation with the City, developed a phased construction approach which maintained rail traffic through the construction site. Key elements to the construction approach included: 1. Design of a bridge structure which was essentially four (4) bridges to enable rail traffic be maintained. 2. Temporary and permanent relocation of rail lines during construction. 3. Temporary shoring to meet the phased approach. 4. Tie-back systems in the area of the Armoury and the heritage buildings to mitigate foundation concerns with regards to the Heritage Structures. 5. Co-ordination with outside organizations such as CN Rail, Rail America, GO Transit and VIA to ensure all needs were met. 6. Design bridge structure to AREMA requirements while minimizing changes in rail grade while implementing new platforms, pedestrian walkways, stairs and tunnels. 7. Relocation of Steam Locomotive and Tender 6167.
机译:随着新市政厅的建设,圭尔夫的核心地区发生了重大变化。其中的一个组成部分是温德姆街的重建,从惠灵顿街到卡登大街,这是通向纽约市机构和商业用途核心区域的主要门户。重建包括新的地下服务以及街道景观,加宽的人行道和自行车道。为了使该新连接正常运行,需要更换CN地铁。温德姆街上现有的CN地铁的历史可以追溯到1900年代初期,并且已经达到使用寿命。桥台是坚固的混凝土,厚度超过1.0 m,几乎没有钢筋,梁是钢,单跨。它的垂直间距不足,存在持续的维护问题,并且没有提供拟议道路横截面所需的水平间距。在项目的初步设计阶段,出现了一些问题,这些是工作中需要解决的问题;其中包括:1.走廊由美国铁路公司运营,由CN Rail租借,并且必须进行维护以提供货运和客运服务。 2.纽约市提议在VIA站区建造一个公交枢纽,以建立一个多式联运站。 3. GO Transit正在实施前往圭尔夫的每日火车服务,这需要新的平台和拟议停车区的隧道通道。 4.纽约市希望建立温德姆街的行人友好通道,其中包括自行车道,宽阔的人行道和街道景观。此外,鉴于通行道路狭窄以及核心区域的历史建筑,例如军械库,VIA站,纪念碑和指定的文物建筑,挫折最小,工作区受到严格控制。 AMEC设计团队在与纽约市密切协商后,制定了分阶段的施工方法,以维持整个施工现场的铁路运输。该施工方法的关键要素包括:1.桥梁结构的设计,基本上是四(4)座桥梁,以保持铁路通行。 2.在施工过程中临时和永久性地迁移铁路线。 3.临时支持以适应分阶段实施的方法。 4.军械库和文物建筑区域的绑扎系统,以减轻基金会对文物建筑的关注。 5.与CN Rail,Rail America,GO Transit和VIA等外部组织进行协调,以确保满足所有需求。 6.根据AREMA要求设计桥梁结构,同时最大程度地减少铁路坡度的变化,同时实施新的平台,人行道,楼梯和隧道。 7.蒸汽机车和招标6167的迁移。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号