首页> 外文会议>AREMA annual conference >Development of Former Oakland Army Base
【24h】

Development of Former Oakland Army Base

机译:奥克兰前陆军基地的发展

获取原文

摘要

The development of the former Oakland Army Base (Project) by the Port of Oakland and City of Oakland has required innovative funding, adaptable delivery methods and persistence in the face of extreme challenges to successfully bring the Project to the point of construction and delivery. This $1.2 billion Project will boost rail access and capacity at the Port, provide infrastructure to target near-term opportunities in manifest and bulk cargo and develop advanced intermodal container handling facilities to poise the Port of Oakland to take advantage of its deep channels and existing rail connections. The resulting global trade and logistics center is a project of national significance. The Port of Oakland is the only international trade gateway for the northern California mega-region; it is the leading U.S. export gateway on the west coast and it is the fifth-ranked U.S. seaport by containerized cargo movements. The federal Base Realignment and Closure (BRAC) Commission closed the Oakland Army Base (OAB) in 1993. The land was transferred to the City of Oakland (City) and Port of Oakland (Port) from 2003-2006. After two decades of strategic planning for the redevelopment of the base and the surrounding lands, the implementation of a bold vision to revitalize Oakland's working waterfront is nearing fruition. In order for the Port and City to implement this development in the midst of a global economic recession, they created a strategy of project phasing and multi-party public-private-partnerships (PPP). The Project is phased to focus initially on basic rail infrastructure; mainline connections, support rail yard and bulk/manifest delivery facilities (Phase 1). The plans for future Phase 2 include a wide-span gantry intermodal yard, necessary rail access enhancements to support the intermodal operations and other industrial land uses. The PPP includes City, private developer participation, as well as state and federal funding, which imposed stringent scheduling requirements on the Project. In order to meet these schedule milestones, the design-build delivery method was employed for portions of the Project. The design-build delivery method allowed the Project to be bid and initial elements of the construction to be underway in time to meet funding milestones. The Port has been planning for the redevelopment of the former OAB for decades and refers to the Port's portion of the Project as the Outer Harbor Intermodal Terminal (OHIT), which is the focus of this paper. The delivery of Phase 1 of OHIT required extensive coordination and collaboration among the Port, the City, private development partners, UPRR, BNSF and affected public and private utilities. This paper describes the intricate development and provides details of the engineering challenges that had to be addressed.
机译:奥克兰港和奥克兰市以前的奥克兰陆军基地(项目)的发展需要创新的资金,适应性强的交付方式以及面对极端挑战的坚持不懈,才能成功地将项目推向建设和交付的阶段。这项耗资12亿美元的项目将扩大港口的铁路运输和运力,提供基础设施,以瞄准舱单和散装货物的近期商机,并开发先进的多式联运集装箱装卸设施,以平衡奥克兰港的优势,以利用其深厚的航道和现有的铁路连接。由此产生的全球贸易和物流中心是具有国家意义的项目。奥克兰港是北加州大区域的唯一国际贸易门户。它是美国西海岸领先的出口门户,也是按集装箱运输方式排名第五的美国海港。联邦基地改组和关闭(BRAC)委员会于1993年关闭了奥克兰陆军基地(OAB)。从2003年至2006年,这片土地被分别转移到奥克兰市(City)和奥克兰港(Port)。在为基地和周围土地的重建进行了二十年的战略规划之后,振兴奥克兰工作滨水区的大胆构想的实施已接近尾声。为了使港口和城市在全球经济衰退中实施这一发展,他们制定了项目分阶段和多方公共-私人伙伴关系(PPP)的战略。该项目分阶段进行,最初将重点放在基础铁路基础设施上;主线连接,支持铁路货场和散装/舱单交付设施(第一阶段)。未来第二阶段的计划包括一个宽跨度的龙门联运货场,必要的铁路通行增强,以支持联运业务和其他工业用地。 PPP包括市,私人开发商的参与以及州和联邦的资金,这对项目施加了严格的进度要求。为了满足这些进度里程碑,对项目的某些部分采用了设计-建造交付方法。设计-建造交付方法使项目可以投标,并且可以按时进行建造的初始要素,以达到资金里程碑。港口数十年来一直在计划对前OAB进行重建,并将港口项目的一部分称为外港联运码头(OHIT),这是本文的重点。 OHIT第一阶段的交付需要港口,纽约市,私人发展合作伙伴,UPRR,BNSF以及受影响的公共和私人公用事业部门之间的广泛协调与协作。本文介绍了复杂的开发过程,并提供了必须解决的工程挑战的详细信息。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号