首页> 外文会议>International conference on computing in civil and building engineering >Mapping Work Process and Information Exchange of Construction Entities for BIM Implementation: Case Study of an Academic Institute
【24h】

Mapping Work Process and Information Exchange of Construction Entities for BIM Implementation: Case Study of an Academic Institute

机译:BIM实施的施工实体制图工作过程和信息交换:一家学院的案例研究

获取原文

摘要

Building Information Modeling (BIM) represents modern construction management concepts that can be integrated in every phase throughout the facility lifecycle. Not only can BIM enhance the performance and efficacy of the construction project delivery process, but it can also improve the quality of the delivered products and reduce various forms of project waste. The principal concept of BIM is the collaboration among all stakeholders in different phases of the facility lifecycle to manage relevant information efficiently. However, this data sharing concept is extremely challenging for the construction industry where the project delivery process is unstructured and fragmented. Thus, the primary step for implementing BIM in any construction entity is to assimilate current organizational conditions, especially its work processes and information exchange. This paper investigates the work process and information exchange in construction projects by focusing on the project owner. The Office of Physical Resources Management (OPRM) at Chulalongkorn University (Thailand), which is responsible for developing the university's construction projects, was chosen as a case study to illustrate an application of the proposed methodology. General information about the OPRM as it relates to facility design and construction was first gathered, including organizational structure, the stakeholders involved, their roles and responsibilities, and current information exchange. The phases of a construction project were defined by adapting from those in the OmniClass Construction Classification System (OCCS), which is used widely in the construction industry. The collected information was analyzed and organized to map important work processes and information exchanges among the stakeholders throughout the project lifecycle. Due to the complexity of workflows, the Business Process Model and Notation (BPMN) was adopted to illustrate and communicate the results. A key feature of the BMPN is the formal documentation of information exchange requirements among the stakeholders in terms of paper and electronic documents. The results of this formal mapping has proven instrumental in helping all parties, especially project owners, comprehend the project delivery process thoroughly so that the appropriate elements can be modified to support and accommodate the transition to BIM implementation.
机译:建筑信息模型(BIM)代表了现代建筑管理概念,可以在整个设施生命周期的每个阶段中进行集成。 BIM不仅可以提高建设项目交付过程的性能和效率,还可以提高交付产品的质量并减少各种形式的项目浪费。 BIM的主要概念是在设施生命周期的不同阶段中所有利益相关者之间的协作,以有效地管理相关信息。但是,对于项目交付过程是非结构化且分散的建筑行业,此数据共享概念极具挑战性。因此,在任何建筑实体中实施BIM的首要步骤是吸收当前的组织条件,尤其是其工作流程和信息交换。本文着眼于项目所有者,研究建设项目的工作过程和信息交换。以朱拉隆功大学(泰国)的物理资源管理办公室(OPRM)为例,该办公室负责开发该大学的建设项目,以说明所建议方法的应用。首先收集了与设施设计和建设有关的OPRM的一般信息,包括组织结构,所涉利益相关者,他们的角色和职责以及当前的信息交换。建筑项目的各个阶段是根据OmniClass建筑分类系统(OCCS)中的定义进行定义的,该分类系统已在建筑行业中广泛使用。对收集到的信息进行分析和组织,以绘制重要的工作流程,并贯穿项目生命周期中各利益相关者之间的信息交流。由于工作流的复杂性,采用了业务流程模型和表示法(BPMN)来说明和传达结果。 BMPN的一个主要功能是正式文件,记录了利益相关者之间在纸质和电子文档方面的信息交换要求。正式映射的结果已证明有助于帮助各方,尤其是项目所有者,全面理解项目交付过程,以便可以修改适当的元素以支持和适应向BIM实施的过渡。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号