Mapping Work Process and Information Exchange of Construction Entities for BIM Implementation: Case Study of an Academic Institute

机译:映射工作过程和BIM实施实体信息交流:学术研究所的案例研究

获取原文

摘要

Building Information Modeling (BIM) represents modern construction management concepts that can be integrated in every phase throughout the facility lifecycle. Not only can BIM enhance the performance and efficacy of the construction project delivery process, but it can also improve the quality of the delivered products and reduce various forms of project waste. The principal concept of BIM is the collaboration among all stakeholders in different phases of the facility lifecycle to manage relevant information efficiently. However, this data sharing concept is extremely challenging for the construction industry where the project delivery process is unstructured and fragmented. Thus, the primary step for implementing BIM in any construction entity is to assimilate current organizational conditions, especially its work processes and information exchange. This paper investigates the work process and information exchange in construction projects by focusing on the project owner. The Office of Physical Resources Management (OPRM) at Chulalongkorn University (Thailand), which is responsible for developing the university's construction projects, was chosen as a case study to illustrate an application of the proposed methodology. General information about the OPRM as it relates to facility design and construction was first gathered, including organizational structure, the stakeholders involved, their roles and responsibilities, and current information exchange. The phases of a construction project were defined by adapting from those in the OmniClass Construction Classification System (OCCS), which is used widely in the construction industry. The collected information was analyzed and organized to map important work processes and information exchanges among the stakeholders throughout the project lifecycle. Due to the complexity of workflows, the Business Process Model and Notation (BPMN) was adopted to illustrate and communicate the results. A key feature of the BMPN is the formal documentation of information exchange requirements among the stakeholders in terms of paper and electronic documents. The results of this formal mapping has proven instrumental in helping all parties, especially project owners, comprehend the project delivery process thoroughly so that the appropriate elements can be modified to support and accommodate the transition to BIM implementation.
机译:建筑信息建模(BIM)代表现代施工管理概念,可以在整个设施生命周期中整合。不仅可以增强建筑项目交付过程的性能和功效,而且还可以提高交付产品的质量,减少各种形式的项目浪费。 BIM的主要概念是所有利益相关者的合作,设施生命周期的不同阶段,有效地管理相关信息。然而,这种数据共享概念对于项目交付过程是非结构化和碎片化的建筑行业极具挑战性。因此,在任何构造实体中实施BIM的主要步骤是吸收当前的组织条件,尤其是其工作流程和信息交换。本文通过专注于项目所有者调查建设项目中的工作流程和信息交流。选择了朱拉隆华恩大学(泰国)的物理资源管理(OPRM)办公室,负责发展大学的建筑项目,作为案例研究,以说明提出的方法的应用。关于OPRM的一般信息,因为它与设施设计和建设有关,包括组织结构,涉及的利益相关者,其角色和责任以及当前的信息交流。建筑项目的阶段是通过适应各种各样的施工分类系统(OCC)的阶段来定义,该系统在建筑行业中广泛使用。分析了收集的信息并组织,以在整个项目生命周期中映射利益攸关方之间的重要工作流程和信息交换。由于工作流的复杂性,采用业务流程模型和符号(BPMN)说明并传达结果。 BMPN的一个关键特征是在纸张和电子文件方面的利益相关者中信息交流要求的正式文件。这一正式映射的结果已经证明有助于帮助各方,特别是项目业主,彻底理解项目交付过程,以便可以修改适当的元素以支持和适应BIM实施的过渡。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号