A FRAMEWORK FOR CONSTRUCTION LABOR PRODUCTIVITY IMPROVEMENT IN EGYPT

机译:埃及建设劳动生产率改进框架

获取原文

摘要

Being the human input of the construction process, construction labors are the most dynamic elements of the construction industry. The cost of labor represents almost half of the overall construction cost. This paper proposes a framework to determine the significant factors impacting labor productivity, considering the Egyptian construction market as a case study. First, a craftsmen questionnaire is devised in light of a list of major factors affecting labor productivity that were specifically extracted from international studies on labor productivity. Second, a site-based survey is conducted with site operatives of different projects in Egypt through the craftsmen questionnaire to determine the particular factors affecting productivity in Egypt. Third, the factors that were commonly agreed upon by the surveyed sample of labors are evaluated and ranked by industry experts through a subsequent importance factor survey. Fourth, the most important factors are plotted in a factors' matrix, which enable the quantification of their relative influences on labor productivity and their interrelated influence through a third survey. Fifth, the output of the factors' matrix is planned to model labor productivity using system dynamics. This technique permits the identification of areas where effort should be exerted to achieve maximum labor productivity by testing the different management strategies that would improve the influencing productivity factors. Validating the model's findings is proposed through a work sampling study on a real-life construction project in Egypt to measure the productivity improvement before and after applying the recommendations extracted from the model. The analogy of this research is not to assign a specific focus on a particular trade; however, the surveys are intended to depict the major factors influencing labor productivity within an entire work site. Upon applying the model findings, the work sampling study is to be repeated to measure the improvement of manpower productive time, which improves the overall site productivity. In the interim, the main outcome of this paper is the identification of the factors with the most influence on labor productivity in Egypt, those were: availability of material, respect for craft workers and foremen, availability of health and safety training, availability of power tools, availability of drawings, absenteeism, jobsite orientation program, coordination between the trades, and waiting for people and/or equipment to move material. As a future plan currently under implementation, the nine factors are to be incorporated in the factor matrix survey and in modeling productivity via system dynamics approach. The findings of the system dynamics model is expected to enable researchers and members of the construction industry to pinpoint the areas requiring more focus on improving labor productivity.
机译:作为施工过程的人类投入,建筑劳动力是建筑业最具活力的元素。劳动力成本代表了整体施工成本的一半。本文提出了一种框架,以确定埃及建筑市场为例研究影响劳动生产率的重要因素。首先,鉴于影响劳动生产率的主要因素列表,设计了工匠问卷,这些问题是从国际劳动生产率的国际研究中专门提取的劳动生产率。其次,通过埃及的不同项目的现场操作性进行了基于网站的调查,通过工匠调查问卷来确定影响埃及生产力的特定因素。第三,通过随后的重要因素调查评估和排序,通过随后的重要性因素调查评估和排序,通过随后的重要因素调查评估和排序。第四,最重要的因素在因素的矩阵中绘制,这使得它们对劳动生产率的相对影响以及通过第三调查的相对影响。第五,计划矩阵的输出计划使用系统动力学模拟劳动生产率。该技术允许识别应通过测试改善影响生产率因素的不同管理策略来实现努力实现最大劳动生产率的地区。通过对埃及实际建设项目的工作采样研究提出验证模型的调查结果,以衡量在应用模型中提取的建议之前和之后的生产力改进。这项研究的类比不是在特定的交易上分配特定的重点;然而,调查旨在描绘影响整个工作场所内劳动生产率的主要因素。在应用模型调查结果时,将重复工作采样研究以衡量人力生产时间的提高,从而提高了整体生产率。在临时,本文的主要结果是识别埃及劳动力生产率影响最大的因素,其中:材料的可用性,尊重工艺人员,尊重工艺人员,卫生和安全培训的可用性,权力的可用性工具,图纸的可用性,缺勤,求职方向计划,交易之间的协调,以及等待人员和/或设备移动材料。作为目前实施的未来计划,九个因素将在因子矩阵调查中并通过系统动力学方法建模生产力。预计系统动力学模型的调查结果将使建筑业的研究人员和成员确定需要更加注重提高劳动生产率的地区。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号