首页> 外文会议>IFIP WG 5.7 international conference on advances in production management systems >Integrated Mixed-Model Assembly Line Balancing with Unskilled Temporary Workers
【24h】

Integrated Mixed-Model Assembly Line Balancing with Unskilled Temporary Workers

机译:综合混合模型装配线平衡与不熟练的临时工

获取原文

摘要

This study extends a single-model assembly line balancing problem to an integrated mixed-model assembly line balancing problem by incorporating unskilled temporary workers, who enhance productivity. An integer program that minimizes the sum of total workstation costs and salaries of skilled permanent and unskilled temporary workers within a specific cycle time is developed. The proposed models is based on particular features of a real-world problem including simultaneous assignments of skilled permanent and unskilled temporary workers as well as precedence restrictions for the tasks.
机译:本研究将单模型装配线平衡问题扩展到集成的混合模型装配线平衡问题,通过加强了不熟练的临时工,他提高了生产率。开发了一个整数计划,可以在特定循环时间内最大限度地减少技术人员永久和非熟练临时工的总工作站和薪金的总和。拟议的模型基于现实世界问题的特定特征,包括熟练的永久和不熟练的临时工的同时分配以及任务的优先限制。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号