首页> 外文会议>Winter Simulation Conference >Simulation in manufacturing planning of buildings
【24h】

Simulation in manufacturing planning of buildings

机译:建筑物制造规划的仿真

获取原文

摘要

Optimal planning of construction projects requires an efficient allocation of available resources. Labor, material, equipment are to be planned, coordinated and quickly adapted to varying conditions. Frequent (design) changes during the construction period, diversity of trades and the high complexity of interacting processes in building manufacturing require innovative ways to support process-influencing decisions - a tool which allows testing interventions and adjustments in the manufacturing process, including individual sub-processes with the best possible efficiency. In this context, the discrete-event simulation comes into place. A research group simulated the manufacturing process of a hotel project in all details in order to examine applicability of simulation in the construction industry and to scrutinize and adjust it according to the construction specifics. The approach taken, the challenges encountered and insights gained will be presented in this article.
机译:建筑项目的最佳规划需要有效分配可用资源。劳动力,材料,设备将计划,协调和快速适应不同的条件。在施工期间经常(设计)变化,交易的多样性和建筑制造中的交互过程的高度复杂性需要创新的方法来支持流程的决策 - 一种工具,允许在制造过程中测试干预措施和调整,包括个人子具有最佳效率的过程。在这种情况下,离散事件模拟到位。一项研究小组在所有细节中模拟了酒店项目的制造过程,以便根据建筑行业的模拟适用性,并根据构造细节审查和调整它。采取的方法,遇到的挑战和获得的洞察力将在本文中提出。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号