首页> 外文会议>Electrical transmission and substation structures conference >Transmission Line Rating, Re-rating, and Upgrading, a Utility Perspective Experiences at Public Service Company of New Mexico (PNM)
【24h】

Transmission Line Rating, Re-rating, and Upgrading, a Utility Perspective Experiences at Public Service Company of New Mexico (PNM)

机译:在新墨西哥州公共服务公司(PNM)进行公用事业的输电线路评级,重新评级和升级

获取原文

摘要

Like many electrical utilities, Public Service Company of New Mexico (PNM) is faced with the issue of maximizing the use of existing transmission facilities. PNM owns and operates over 2,500 miles of transmission line located throughout the state of New Mexico. Many of these facilities were built in the time frame from the mid-1950's to the early 1970's. The lines were designed to standards current at the time of construction and to meet the long term system planning requirements projected at that time. These lines continue to be an integral part of PNM's system. Their lifespan has exceeded the planning horizon and the need for transmission of power has increased. In an on-going program that has now spanned over fifteen years, PNM has upgraded over a thousand miles of its 115kV, 230kV, and 345kV transmission lines. This paper addresses PNM's line rating and upgrade program including the establishment of utility line rating standards, analysis of existing field conditions, techniques for mitigating sag limited spans, and examples of typical projects.
机译:像许多电力公司一样,新墨西哥州公共服务公司(PNM)面临着最大程度地利用现有传输设施的问题。 PNM在新墨西哥州拥有并经营着超过2500英里的输电线路。其中许多设施都是在1950年代中期至1970年代初期建造的。这些线的设计符合建造时的现行标准,并符合当时预计的长期系统规划要求。这些生产线仍然是PNM系统的组成部分。它们的寿命已经超出了计划范围,并且对电力传输的需求也在增加。根据一项持续了十五年的持续计划,PNM已对其115kV,230kV和345kV输电线路进行了1000多英里的升级。本文介绍了PNM的线路额定值和升级程序,包括建立公用事业线路额定值标准,分析现有现场条件,缓解下垂极限跨度的技术以及典型项目的示例。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号