首页> 外文会议>Electrical transmission and substation structures conference >Transmission Line Rating, Re-rating, and Upgrading, a Utility Perspective Experiences at Public Service Company of New Mexico (PNM)
【24h】

Transmission Line Rating, Re-rating, and Upgrading, a Utility Perspective Experiences at Public Service Company of New Mexico (PNM)

机译:传输线路评级,重新评级和升级,新墨西哥州公共服务公司的公用事业透视体验(PNM)

获取原文

摘要

Like many electrical utilities, Public Service Company of New Mexico (PNM) is faced with the issue of maximizing the use of existing transmission facilities. PNM owns and operates over 2,500 miles of transmission line located throughout the state of New Mexico. Many of these facilities were built in the time frame from the mid-1950's to the early 1970's. The lines were designed to standards current at the time of construction and to meet the long term system planning requirements projected at that time. These lines continue to be an integral part of PNM's system. Their lifespan has exceeded the planning horizon and the need for transmission of power has increased. In an on-going program that has now spanned over fifteen years, PNM has upgraded over a thousand miles of its 115kV, 230kV, and 345kV transmission lines. This paper addresses PNM's line rating and upgrade program including the establishment of utility line rating standards, analysis of existing field conditions, techniques for mitigating sag limited spans, and examples of typical projects.
机译:与许多电气公用事业公司一样,新墨西哥州的公共服务公司(PNM)面临着最大限度地利用现有传输设施的问题。 PNM拥有,拥有超过2,500英里的传输线,位于新墨西哥州州。这些设施中的许多设施是从1950年代中期到1970年代早期的时机建造的。这些线路旨在施工时的标准电流,并满足当时预测的长期系统规划要求。这些行继续成为PNM系统的一个组成部分。他们的寿命超过了规划地平线,并且需要传播权力的需求增加。在一项现已跨越十五年的持续计划中,PNM已经升级了115kV,230kV和345kV传输线的千里。本文涉及PNM的线路评级和升级计划,包括建立公用事业线评级标准,现场条件的分析,用于减轻SAG限制跨度的技术,以及典型项目的示例。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号