首页> 外文会议>ASCE Pipeline Division's international conference >PCCP Condition Assessment Methodology, What is Right for You?
【24h】

PCCP Condition Assessment Methodology, What is Right for You?

机译:PCCP条件评估方法论,什么适合您?

获取原文

摘要

Established as a Union Pacific railroad tent town in 1867, Cheyenne, named for a local Indian tribe, is now a progressive city that celebrates both its pioneer heritage and tomorrow's technology. As a railroad and cattle center, Wyoming's capital and largest city has always been an important Western crossroads and a unique blend of Western Cowboy, Military, and Contemporary cultures.As a city grows, the need for infrastructure to support the basics of life, e.g. water, for a community efficiently and effectively becomes necessary. In the early 1960's, Cheyenne began to realize that their growing water demands for water could not be sustained with existing water wells and surface water, so Cheyenne once again applied its pioneering heritage and great forethought to develop an additional source of water. Because water rights in the North Platte River drainage were already appropriated during normal flows, Cheyenne looked farther west, over 115 miles to the headwaters of the Little Snake River in the Sierra Madre Mountains on the western slope of the Continental Divide. As a result, an intricate trans-basin diversion plan was developed whereby water collected from the Little Snake River drainage could be traded for water from a closer and more deliverable source. The water collection system known as the Little Snake River Water Project - Stage I and Stage Ⅱ was completed in 1965 and 1985 respectively.During the Stage Ⅱ construction which included the installation of 21 miles of diversion piping consisting of reinforced concrete pipe (RCP) and prestressed concrete cylinder pipe (PCCP), the project was plagued with unique challenges that resulted in circumferential cracking of the PCCP pipe caused by poor pipe support/compaction and faulty design assumptions. To address these issues, a series of repairs were developed and instituted. These repairs were not directed at pressure related failures as there was no evidence of a loss of core compression/prestress, the fundamental property concerning the integrity of PCCP pipe.With appropriate background information and knowledge of the piping system, a systematic plan for sequencing the necessary field work and engineering analysis to maximize the return on the invested inspection dollars through the prudent use of technology, whether it be geotechnical, visual, aural, or electromagnetic inspection methods.
机译:夏安市(Cheyenne)成立于1867年,是一个联合太平洋铁路帐篷镇,以当地印第安部落的名字命名,如今已成为一座先进的城市,既庆祝其先驱遗产,又庆祝明天的技术发展。作为怀俄明州的铁路和牛中心,怀俄明州的首府和最大城市一直是重要的西方十字路口,并且是西方牛仔,军事和当代文化的独特融合。水,对于社区来说,有效而有效地变得至关重要。在1960年代初期,夏安开始意识到,现有的水井和地表水无法满足他们不断增长的用水需求,因此夏安再次利用其开创性的遗产和极富远见的思想来开发更多的水源。由于北普拉特河排水系统中的水权已在正常流量中获得使用,因此夏安向西望去,向西到达大陆分界线西坡马德雷山脉的小蛇河上游源头超过115英里。结果,制定了复杂的跨流域调水计划,从小斯内克河流域收集的水可以用来交换来自更近,更可交付的水源的水。小蛇河水项目第一阶段和第二阶段的集水系统分别于1965年和1985年完成。在第二阶段的建设中,安装了21英里的分流管道,其中包括钢筋混凝土管(RCP)和水管。预应力混凝土圆筒管(PCCP),该项目面临着独特的挑战,这些挑战导致PCCP管的周向开裂是由于支管/压紧力差和设计假设错误而引起的。为了解决这些问题,开发并进行了一系列维修。这些维修并非针对与压力有关的故障,因为没有证据表明岩心压缩/预应力会损失,这是涉及PCCP管道完整性的基本特性。在掌握了适当的背景信息和管道系统知识的基础上,对管道系统进行排序的系统计划必要的现场工作和工程分析,以通过谨慎使用技术(无论是岩土,视觉,听觉还是电磁检查方法)来最大化投资检查费用的回报。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号