TRENCHLESS RENEWAL OF WATER MAINS BENEFICIAL TO BOTH THE EXISTING WATER MAIN AND THE ASPHALT PAVEMENT

机译:对既有水源和沥青路面均有益的无偿更新水源

获取原文

摘要

How many times have we witnessed a newly installed street pavement be prematurely excavated to repair anunforeseen water main break? Why do road crews wait over a year before installing the final asphalt layer on theroadway after a new water main installation? Should trenchless technologies be preferred over open cut replacementto increase life expectancy of the new pavement? Is public perception and political responsibility important to theutility manager? These issues and questions are often used in the decision process to choose the best method toeither replace or renew a deteriorated water main while at the same time considering the life cycle of the roadway.Like many North American cities, the city of Dollard des Ormeaux has completed and put in place an AssetManagement Program for its water, sewer and roads infrastructures. This Program allows the EngineeringDepartment to target the water mains that need to be renewed and the streets that need repaving. For the latter case,the ensuing inspection of the water and sewer infrastructures under these streets has led to the structural renewal ofthe water mains under them.Today, many water utilities work closely with city road departments to efficiently schedule their construction workand to achieve the best design possible for both the water main and the new pavement. For the past ten years, theCity of Dollard des Ormeaux has been using structural cured in place liners to renew their water mains and hasconstantly saved money therefore optimizing each dollar spent on infrastructure renewal. This paper will present,with the help of examples, the decision criteria used by the City of Dollard des Ormeaux to choose and prioritize therenewal of their water mains and also discuss how sidewalk and street paving considerations often impact theirwater main renewal priorities.
机译:我们目睹过多少次过早开挖的新路面用于维修 不可预见的水管破裂?为什么路员要等一年以上才能在路面上安装最后的沥青层 新水管安装后的巷道?非开挖技术应比开挖技术更受青睐吗? 增加新路面的预期寿命?公众的看法和政治责任对 公用事业经理?这些问题通常在决策过程中用来选择最佳方法来解决。 在考虑道路生命周期的同时更换或更新已损坏的供水总管。 像许多北美城市一样,Dollard des Ormeaux市也已完成并建立了资产 水,下水道和道路基础设施管理计划。该计划允许工程学 部门针对需要更新的水管和需要重新铺设的街道。对于后一种情况, 随后对这些街道下的自来水和下水道基础设施的检查导致了对结构的更新 他们下面的水管。 如今,许多自来水公司与城市道路部门紧密合作,以有效地安排其施工工作 并为水主干道和新路面实现最佳设计。在过去的十年中, Dollard des Ormeaux市一直在使用结构固化的内衬来更新其水管,并且已经 不断节省资金,因此优化了基础设施更新上的每一美元支出。本文将介绍 在实例的帮助下,Dormond des Ormeaux市用于选择优先级的决策标准 更新他们的水管,还讨论人行道和街道铺路的考虑因素通常如何影响他们 供水主体更新优先事项。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号